- 1、本文档共25页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SECTION8PILINGWORKSGENERAL第8部分打桩工程总论.
SECTION 8 PILING WORKS GENERAL 第8部分 打桩工程 总论
G.S. Clause 8.06 is deleted and replaced by the following :-通用规范(G.S.) 8.06款删除并用以下代替
Grouting灌浆 8,06 (1) In general, grouting for piling works shall comply with
Section 17 of the Genera! Specification unless otherwise stated, in particular, the following clauses in Section 17 shall be complied with, disregarding the stipulation for piling systems therein,总的来说,用于成桩的灌浆,除非另有陈述外,应符合总规范第17部分的要求,特别应符合总规范第17部分的以下条文,在这方面,与原约定的打桩系统无关。
Clauses 17.15 to 17.18 regarding that mixes for grout.第17.15款至17.18款有关浆料的配制。
Clauses 17.59 to 17.61 regarding testing for bleeding and free expansion of grout,第17.59至17.61关于浆料的凝胶收缩和自由膨胀试验。
Clauses 17.62 to 17.64 regarding testing for crushing strength of grout.第17.62至17.64关于浆料的抗压强度试验。
Before grouting, the bottom of the drillhole shall be blown clear by high pressure air or by an approved alternative method,在做灌浆前钻孔底部应用高压气吹干净,或用批准的变通方法清理干净。。
Grout shail be introduced at the lower end of the drillhole and shall displace al! air and water through the top of the drillhole. All minipiles shall be grouted in one continuous operation.浆料应注入钻孔底部并应通过桩顶置换所有气和水,所有小桩应一次连续操作完成
The following reference is added to G.S. Clause 8.11以下内容增加到G.S.第8.11款
Safety of Piling 桩基施工的安全管理 8.11 Occupational Safety Health (1993), Works(1993)版职业、安全与健康
The following is added after G.S. Clause 8.11 : 以下内容增加到G.S.第8.11款~
Ground Conditions地基状况 8.11A The opinions or conclusions given in any factual or interpretative对任何实况和解释给出意见和总结
ground conditions investigation reports are given for information only. Neither the Employer nor the Engineer accepts any responsibility whatsoever for the accuracy or sufficiency of these information and the Contractor shall carry out at his own expense any further enquires and investigations he requires for his own information. The Contractor shall report immediately to the Engineer any circumstance that in the Contractors opinion indicates that the ground conditions diff
您可能关注的文档
- SCI收录的地质学科期刊..doc
- 柱钢筋识图与计算.doc
- SCI论文编辑教你如何准备SCI论文和写作..doc
- SCL-90心理量表..doc
- SCL-90量表详细..doc
- scom2102网络设备发现..docx
- SCOOSR507光盘启动安装文档..doc
- SCO与ACL区别..doc
- ScreenSize屏幕尺寸..doc
- Scratch编程入门..doc
- 2025年全国爱国卫生月活动总结(28篇).docx
- 2025年公交驾驶员年终总结(6篇).docx
- 2025年公司年度行政工作计划(31篇).docx
- 知到智慧树网课:C语言编程新思路(山东理工大学)章节测试满分答案.pdf
- 《毛泽东思想和中国特色社会主义理论体系概论》专题测试参考答案.docx
- 知到智慧树网课:C语言编程方法与思想(北京航空航天大学)章节测试满分答案.docx
- 知到智慧树网课:大学英语课程思政(哈工)章节测试满分答案.docx
- 2025年二级建造师法规章节精编习题库.pdf
- 2025年二级建造师法规章节精编习题库.doc
- 2025年北京市三类人员安全员c3证考试题库及答案.doc
文档评论(0)