- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Energy Control (LOTO) Guide for OSHA 1910.147
DEPARTMENT OF ENERGY ENVIRONMENTAL PROTECTION
79 Elm Street
Hartford, CT 06106-5127
Daniel C. Esty, Commissioner
CONTROL OF HAZARDOUS ENERGY
PROGRAM
[LOCKOUT / TAGOUT]
29CFR 1910.147
Revised November 13, 2013
Directive 5560, D9 – Lockout Tagout Program requires this Agency to establish and maintain policies regarding the control of hazardous energy. This Program has been written for that purpose. The Control of Hazardous Energy Program will be reviewed as necessary by the Safety Health Office and each Bureau or Office of the CT Department of Energy Environmental Protection (DEEP). Following review (and amendment if indicated) the Facility Managers, the Chief of Staff, and the Program Specialist from the Agency Safety Health Office (Safety Office) shall sign and date the plan below.
The Control of Hazardous Energy (Lockout / Tagout) Program was reviewed for accuracy and compliance with current workplace practices as of November 13, 2013.
Reviewer’s Name Title Signature Date Facility Manager Robert Klee, Chief of Staff Agency Safety Health Office Peg Sargis, Program Specialist
Table of Contents
Introduction
Section I. Roles and Responsibilities
Section II. Specific Program Definitions
Section III. Program Elements
Facility Survey
IDs of Energy Isolating Devices
Protective Materials and Hardware
Assignments of Duties and Responsibilities
Energy Control Procedures
Written Procedures
Periodic Inspections / Audits
Training and Communications
Other
Appendices
Appendix A.
Facility Lockout / Tagout Administrator
List of Machines / Equipment and Energy Isolating Devices
Standardized Format for Facility
Appendix B.
Lockout / Tagout Form and Checklist
Lockout / Tagout Procedure Sheet Guide
Appendix C.
Inspection / Audit Schedule
Certification of Inspection / Audit
INTRODUCTION
In accordance with OSHA 29 CFR 1910.147, the following program has been developed for
您可能关注的文档
- Culture of Japan.DOC
- cs100使用.ppt
- DB2_HADR_测试计划v2.1.doc - Index of.DOC
- DBE-MSDS.doc.DOC
- DBX260中文说明书.doc
- Defining Quality in Education - Unesco.DOC
- DNA复制复习题.doc
- Doc - Capsim Business Simulations.DOC
- DTII(A)重型皮带机传动滚筒改向滚筒电动滚筒等所..DOC
- DL/T 261编制交流.ppt - 电厂热工自动化.PPT
- ep3.1.3 eu.DOC
- Financial crisis gives birth to the influence ..DOC
- Forklift Safety Instructor Outline.DOC
- ftth 武汉移动ftth验收规范(试行).DOC
- GB 3947-83 声学名词术语.DOC
- gb50300-2013新版分部分项工程划分.DOC
- gf-2000-0209.DOC
- GHTF SG1 - International Medical Device Regula..DOC
- Global History and Geography I E.DOC
- Geometric Dimensioning.DOC
文档评论(0)