- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
0 英国皇家特许建造师(CIOB)教学计划(正式稿)EN0 英国皇家特许建造师(CIOB)教学计划(正式稿)EN
SCHEME FOR CIOB TRAINING IN EAST OF CHINA
Background
Based on CIOB member’s criteria and relevant requirements on knowledge and professional skill, the training program is focusing on senior professionals working in East of China to elevate their international project management skill to meet the requirements of MCIOB.
Chapter one Course and Syllabus
Ⅰ General Introduction of CIOB (4hrs)
Introduction of CIOB
Introduction of CIOB International
Introduction of CIOB China
CIOB Knowledge System
Conduct Code of CIOB Members
CIOB Professional Interview
Continuing Professional Development
Ⅱ Building Technology (8hrs)
Comparison Between Chinese and U.K. of Construction Industry
1.1 Status of Economics, Real estate and Construction
1.2 The volume of GDP from Construction sector, professional category and their numbers
1.3 The type of enterprises including Developer, Architecture and Designer, Consultants, General Contractor and Suppliers
1.4 The technical level of Construction
Selection of Building Structural System
2.1 General principles: Uniform of Construction and structure
2.2 Type of structure
2.3 Build material selection
2.4 Case
Historic Building and Maintenance Work
3.1 General principles
Functional requirements
Codes
3.2 Organising work for different status:routine, emergency and upgrade
3.3 Historical building
Understanding
Life cycle evaluation
Remedy technology, design and construction
Reinforce materials
Case
Application of New Technology, Materials, Building Services and Processes
4.1 New technology
Case:Millennium Dome and others
4.2 New materials and facilities
Case
4.3 New method
Case:SMW、SMP
4.4 Safety inspection and evaluation
Intelligent Building and Green Building
5.1 Concept
5.2 Green Building
Case
5.3 Energy Efficient Building
Environmental Protection
6.1 Status and relevant regulation
6.2 The trends and future plan
6.3 Zero-pollution case
6.4 Material selection
Ⅲ Management of Project Development (8hrs)
Concept
Project Defi
您可能关注的文档
- (广东省粮食局办公大楼7-8、10层装修改造工程)施工组织设计(广东省粮食局办公大楼7-8、10层装修改造工程)施工组织设计.doc
- (打印版)英语单词分类记忆(打印版)英语单词分类记忆.doc
- (外研版)高中英语必修一:模块质量测评1(module 1)(含答案)(外研版)高中英语必修一:模块质量测评1(module 1)(含答案).doc
- (操作一~十五)上海双城国际贸易公司 TMT实训(操作一~十五)上海双城国际贸易公司 TMT实训.doc
- (改)瓜州县乡镇和部门均衡发展工作档案建设目录和要求(改)瓜州县乡镇和部门均衡发展工作档案建设目录和要求.doc
- (政治)揭阳一中2013届高一第二次阶段考试(政治)揭阳一中2013届高一第二次阶段考试.doc
- (新)安全管理体系(新)安全管理体系.doc
- (新)论自然人国籍冲突问题及解决方法(新)论自然人国籍冲突问题及解决方法.doc
- (文传芳主编)新视野大学英语视听说教程1 听力原文Unit 8(文传芳主编)新视野大学英语视听说教程1 听力原文Unit 8.docx
- (新版)广州版英语 七上unit 4 测试题(含听力材料与答案)(新版)广州版英语 七上unit 4 测试题(含听力材料与答案).doc
文档评论(0)