1 h420083 coordinate management of the subcontractor1 h420083 coordinate management of the subcontractor.doc
- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1 h420083 coordinate management of the subcontractor1 h420083 coordinate management of the subcontractor
1 h420083 coordinate management of the subcontractor
1 h420083 coordinate management of the subcontractor
The subcontractor and the contractor has clear in engineering and labor contract relationship, is the whole project construction organization, planning and control shall form an integral part of the mutual restriction and mutual support, to make the project go smoothly, important is the science of communication and coordination. This article main topic is: the content of the project department and management of subcontractors; In the form of project department and management of subcontractors.
The subcontractor and The contractor has The clear in engineering and labor contract relationship, is The whole project construction organization, planning and control shall form an integral part of The mutual restriction and mutual support, to make The project go smoothly, important is The science of communication and coordination. This article main topic is: The content of The project department and The management of subcontractors; In the form of project department and the management of subcontractors.
A, the contents of the project department and management of subcontractors
A, the contents of the project department and the management of subcontractors
(a) engineering subcontractors
(a) engineering subcontractors
1. Coordinate management scope. The points are defined in the contract.
1. Coordinate management scope. The points are defined in The contract.
2. The principle of coordination management. Is a subcontractor to the contractor is responsible for, all foreign contact on engineering construction activities, such as to the party, design, supervision, supervision and inspection agencies, such as contact, besides is made by authorization of the total package party agreed to, should be through the total package party.
2. The principle of coordination management Is a subcontractor to The contractor Is responsible for, all foreign contact on engineering co
您可能关注的文档
- 0714 高三英语-重点中学2015届高三上学期第一次联合考试英语试题0714 高三英语-重点中学2015届高三上学期第一次联合考试英语试题.doc
- 0714043梁玉琼0714043梁玉琼.doc
- 07700103-胡启庆-基于LED照明的智能路灯设计07700103-胡启庆-基于LED照明的智能路灯设计.doc
- 07届本科毕业论文备选题(英语专业)07届本科毕业论文备选题(英语专业).doc
- 07职高英语期终试卷07职高英语期终试卷.doc
- 07脱产专科建筑工程2组-毕业设计(王玉镯)07脱产专科建筑工程2组-毕业设计(王玉镯).doc
- 08-2012监考人员手册08-2012监考人员手册.doc
- 0801大学英语0801大学英语.doc
- 0802 大学英语0802 大学英语.doc
- 080204 高分子材料与工程080204 高分子材料与工程.doc
- 25上半年2期套题班-行政职业能力测验(八).docx
- 公考讲义-2025年1月时政汇总.pdf
- 2025年省考逻辑填空1000 高频实词积累+刷题早读课 讲义.pdf
- 25上半年2期套题班-行政职业能力测验(九).docx
- 2025四川事业编FB综合岗考试-综合能力测试讲义-主观题基础,案例分析题,公文写作及文章写作题.pdf
- 25上半年2期套题班-行政职业能力测验(五).docx
- 2025申论多省联考刷题课真题资料-2025国考执法课程.doc
- 2025申论多省联考刷题课真题资料-2024江西执法课程.doc
- 25上半年2期套题班-行政职业能力测验(十).docx
- 2025申论多省联考刷题课真题资料-2024福建县乡课程.doc
文档评论(0)