- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
 - 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
 - 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
 - 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
 - 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
 - 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
 - 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
 
 
        查看更多 
         
       
 
      
        2-2 - WB EA guidance2-2 - WB EA guidance
       
 
       
        Guidance on Environmental Assessment 1. Environmental assessments (EAs) of Bank1 projects are carried out in a broad range of sectoral, geographical, cultural, and socio-economic contexts. Projects assessed may be large or small, concentrated at one specific site or dispersed over a large area (e.g., in the form of numerous subprojects). For these reasons EAs vary greatly in terms of the type of analysis, the types of relevant issues and impacts, and the breadth and depth of coverage. Moreover, since environmental impacts usually occur in a variety of natural and social settings and affect multiple sectors, it takes a multidisciplinary team to carry out most EAs adequately. 2. Consequently, meaningful guidance on EA—complementing the policy and procedural requirements in OP 4.01 and BP 4.01—has to cover specific sectors as well as cross-sectoral issues. It must also explain how to apply different types of EA for different types of projects and how different methods developed by different disciplines may be used in support of EA. The Bank provides such guidance to its staff and borrowers in the Environmental Assessment Sourcebook (1991) and the Environmental Assessment Sourcebook Updates issued periodically since 1993. These documents are available electronically and in hard copy from the Environment Sector Board. Timing of EA Reports 3. OP 4.01 and BP 4.01 require that EA reports for Category A projects be submitted to the Bank prior to appraisal. The Bank considers EA to be part of the information it requires to appraise a project adequately. Therefore, it allows exceptions only in very specific circumstances, such as the following: (a) Sector investment loans and financial intermediary operations: EAs for subprojects that are not known prior to the Bank’s appraisal of the project are prepared at the same time as the subprojects are prepared (see OP 4.01, paras. 9 and 11-12). However, information on the EA process for subprojects is presented prior 
       
 
      您可能关注的文档
- 1、生产管理类(2015-1420年修订版)1、生产管理类(2015-1420年修订版).doc
 - 1、船舶设备管理分工明细表1、船舶设备管理分工明细表.doc
 - 1初一上册数学期末考试题(难题)121初一上册数学期末考试题(难题)12.doc
 - 1、营运部现场管理科工作流程1、营运部现场管理科工作流程.doc
 - 1厨房部员工培训计划1厨房部员工培训计划.doc
 - 1土木工程专业本科人才培养方案(道桥合并12.05.04)1土木工程专业本科人才培养方案(道桥合并12.05.04).doc
 - 1复件 广西宜州亚东海鲜大酒楼筹备工作进度一览表1复件 广西宜州亚东海鲜大酒楼筹备工作进度一览表.doc
 - 1大客户部岗位职责1大客户部岗位职责.doc
 - 1安全生产责任制度1安全生产责任制度.doc
 - 1宋堡小学小学精细化管理实施方案1宋堡小学小学精细化管理实施方案.doc
 
- 2-2 答案 人大继续教育学院 大学英语2 作业答案2-2 答案 人大继续教育学院 大学英语2 作业答案.doc
 - 2-药理学名词解释english and chinese2-药理学名词解释english and chinese.docx
 - 2-新闻稿之二:品牌、设计师介绍2-新闻稿之二:品牌、设计师介绍.docx
 - 2-阀门种类术语2-阀门种类术语.doc
 - 2. 2014长宁一模2. 2014长宁一模.doc
 - 2. 2014长宁一模英语试卷2. 2014长宁一模英语试卷.doc
 - 2. American History2. American History.doc
 - 2. UN Practical Manual on Transfer Pricing for Developing Countries2. UN Practical Manual on Transfer Pricing for Developing Countries.doc
 - 2.0升级版远程抄报流程及常见问题2.0升级版远程抄报流程及常见问题.doc
 - 2.3文明工地创建方案2.3文明工地创建方案.doc
 
有哪些信誉好的足球投注网站
 
      
      
文档评论(0)