戴振宇+王金标.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
戴振宇王金标戴振宇王金标

2.3 Equipment installation In initial construction, project department should learn more about the design of the perform holes for hoisting equipment ,reserve suitable position,if necessary, know more about the wight of single piece of equipment, the overall dimension of the equipment and the situation of equipments which have special requirements. Draw up a reasonable plan of hoisting equipment and installation position. For the very sophisticated equipments which have complicated structure,greater height and wight, project department can make an individual plan, implement the plan after it has been approved by the relevant units. 1. The firm support is needed in the carrying and hoisting construction of equipment,the positon of main force bearing point should be higher than the center of gravity of equipment to prevent the oblique. To prevent the damage,soft material should used in the contact surfaces of equipment and slings. 2. Before the installation of equipment,equipment manual should be read carefully. Pay more attention to the base coordinate, elevation and the position of threaded hole to ensure quality. 3. During the installation of equipment, make sure the leveling and alignment of equipment, and the equipment should be connected with basis or other buildings. 2.4 Cleaning and pressure test of equipment 1. For the whole of equipment,debris and grease of surface should be cleaned up,make necessary adjustments for rotational parts. For the static equipment, surface of equipment should be swept to meet the standards of cleanliness. 2. Pressure test: The testing of equipment’s pressure and the using of medium should meet the requirement of design or equipment specification. If it is necessary , related personnel should do the test with staffs of supplier.If there are no special requirements, the operation should meet the requirement of code for construction and acceptance. Before the test, requirements should be examined carefully, geting every fastenin

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档