网站大量收购闲置独家精品文档,联系QQ:2885784924

Class6技术-1风险识别的工具和方法解析.ppt

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Class6技术-1风险识别的工具和方法解析

Section 3: FEMA method FEMA-related issues Potential failure modes: means form or problems that may occur do not satisfy the requirements of the process for some projects. It may be caused by potential failure modes under a process, and it may be the consequence of a previous process failure modes. The consequences of failure: refers to the adverse effects of the failure mode to product quality or customer. Cause of failure / mechanism: refers to the failure about how it happened, and should be described on basis of the principle that control can be corrected. Procedure of FEMA FEMA- Severity” S” Severity S- for consequences / issues Severity corresponds to the consequences. Generally only design changes can change the severity of the consequences. Severity established links between failure modes and level of risk, and focus on high severity, play a guiding role in resources. Divided into 1-10 severity level of a failure mode, choose the consequences maximum calculated RPN. FEMA- Frequency “O “ Frequency O Frequency refers to the frequency of failure cause / mechanism is expected to occur, points 1-10. Preventive measures can reduce the frequency of occurrence. FEMA- Detection “ D “ Detection D Assessment the possibility of failure discovery for the existing control methods. In doing Detection Evaluation, the assumption that failure mode has occurred must be done. Control measures may be considered as follows: inspection and testing procedures, control of nonconforming product program, mistake proofing techniques, statistical process control, process control plans. Divided into 1-10. FEMA- Risk Priority Risk priority number (RPN) is a product of formula related to serious degree (S), the number of frequencies (O) and the number of detecting (D) RPN = S · O · D ??????Risk priority number is a measure of risk. ??RPN value between 1-1000, if you are at high risk priority number, the designer must take corrective measur

文档评论(0)

此项为空 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档