- 1、本文档共43页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
assurance To ensure that the time limit for a project technical assurance measures
导读:就爱阅读网友为您分享以下“To ensure that the time limit for a project technical assurance measures”资讯,希望对您有所帮助,感谢您对92的支持!
To ensure that the time limit for a project technical assurance measures
Prepare technical guarantee work in construction
After received the design data, immediately organize relevant professional and technical personnel, the blue prints.the design carefully understand design intent, active communication with the design unit, take the time to technical clarificaiton. Set up a technical team to research on key technology problem. Strengthen the on-site technical guidance and test work, put an end to a technical error occurred; Constantly improve the construction process, improve work efficiency, speed up the construction progress. To the technical requirements for the type of work, the process starts with strong before training, organization in the construction of professional team to speed up the process, improve the quality.
Standard floor adopts layer structure early supporting system, accelerate the turnover of the template, reduce the template and the support of a mass, improve work efficiency and cost savings.
In the main structure with a number of the additive agent in concrete construction, early strength agent, water reducing agent and retarder, etc.) technology, to control the quality of the construction process of concrete, and no water leakage in concrete curing agent curing technology.
Reasonable organization construction, speed up the construction process, make process can cross between each job, guarantee the time limit for a project completed on schedule.
Do a good job in planning management, the balanced production, construction progress control in stages, the planning department in accordance with the requirements of the whole contract period of quantities and the total time limit for a project, combined with the construction organization design, pre
文档评论(0)