网站大量收购闲置独家精品文档,联系QQ:2885784924

Transportandstorageofmaterials..doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Transportandstorageofmaterials.

Transport and storage of materials 6.12.3.1 material transportation 1, all kinds of products mainly use 3 tons, 1.5 tons of truck transportation to the site. 2, to make the product deformation damage, mainly a hob loading forms of transport. 3, factory delivery: (1) the factory project department plans to arrange production and processing, delivery, contact projects department materials phone before delivery, if a site unloading conditions, formulate relevant handling quantity, date of handling, cargo floor and assistance program etc. (2) the transport of goods should be securely fastened. (3) the rugged road should be slow. 4, unloading: (1) to reduce the number of handling, the truck to the site, according to the status of the project site directly into the construction location or into the reservoir. (2) vehicles to the site according to the outbound order, after counting the number of quality products. (3) finished unloading trucks out of the site to return as soon as possible, to ensure that the site of the roads. (4) trucks in and out of the site should be pay attention to safety. 6.12.3.2 materials piled up 1, in the first layer in indoor or contractor to provide temporary facilities construction set materials hardware warehouse (mainly put aluminum door and window, profiles, accessories, glass, plastic materials, such as, build a station). 2, after the goods to the site, in order to reduce loss of handling the material shipped to the installation place, as far as possible on the day of the materials are installed on the same day, keep the site clean. 3, piled up must have channel, dont cause secondary handling. 4, considering the installation sequence and decided to storage location. 5, aluminum dont directly on the ground, depending on the profile shape, size, size, both ends on sleepers, sleeper distance shall not be greater than 1000 ㎜, in case of profile extrusion deformation profiles neatly stacked and identity. Six separate piles, ir

文档评论(0)

xznh + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档