建筑电气的几点建议和继电保护..doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑电气的几点建议和继电保护.

The current building several problems in electrical design 1 Introduction Engineering design is the most important infrastructure , design documents are the main basis for the construction, design quality is to determine the quality of the project the first part. My project quality accident statistics show that from the design of the project quality accident causes accounted for 40.1%; construction causes accounted for 29.3%; other reasons (such as equipment and materials quality, etc.) caused by accounting for 30.6%. This shows the implementation of the project quality control is the key to the design quality control. Electrical engineering is no exception. 2 affect the quality of the project electrical design of several buildings Qualified architectural design should meet the requirements of seven quality characteristics, namely functionality, security, economy, credibility, can be implemented, adaptability and timeliness. Design units through the design of this assessment should be qualified to deliver the construction design documents. In fact many of the delivery of construction design documents exist, or the lack of quality characteristics deviate from the requirements defects. The impact on the quality of electrical engineering design problems are primarily manifested in the security, reliability (including the availability, reliability, maintainability, etc.) and can be implemented of missing or deviate from. The following comment on a few of the most common aspects were discussed. 2.1 Design in breach of or deviation from the provisions of design specifications, safety, credibility with respect to non-implementation of the design specifications are quite common For example, before a City Hall Square Garden (including the square green garden lighting, lawn lighting and sound and light Fountain Square Center) project discretionary electrical construction drawings submitted to the following problems: the absence of electrical protective ea

文档评论(0)

sa1fs5g1xc1I + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档