会议发言英文.doc

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
会议发言英文

会议发言英文 Thank you, prof. …. My name is ….. I’m from ….. I am very pleased to be here to join this forum. The topic of my presentation is properties of rapid construction materials for soil pavement of field airfield. As is shown in the picture, the main parts of my research are about soil pavement. My presentation will include these four parts: First, some background information about this research; second, the main work we have done; third, some conclusions we have got and the last: innovation and presentation of our published papers. Why I choose this item? I think it can be illustrated from the following four parts. First, the existing quantity of airfields is still not sufficient and the airfields have many shortcomings especially in war time. Second, the complementary facilities, such as highway runways are far less than airfields, however, have more weakness. Third, a certain amount of field airfield is quite necessary considering some emergencies such as rescue and disaster relief. Forth, the field airfield can fill the void of airfield and they can be combined to be airfield network. The meaning and aim of this research contains three parts. Fast, convenient and validity, fast means the field airfield must be constructed as fast as possible, convenient means the construction should need the minimum equipment, labor and materials considering the actual construction condition, validity means the constructed airfield is able to support the operation of given aircraft in specifically time. Just like many other territories, the situation of the research is that the U.S. Army takes advanced line. The U.S. Army declares that they can reach to anywhere on the earth in 96 hours, the most important method for force projection is though aircraft, thus rapid construction of pavement is the key problem for rapid force transportation. The main work we have done can be summarized as four parts, materials choosing, scheme making, mechanical properties research a

文档评论(0)

raojun00003 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档