- 1、本文档共36页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
VMware_SRM容灾方案解析
* * NOTE: This slide has animation Testing of a SRM Recovery Plan can be completed without impacting the protected VMs (app_vm7 to app_vm12) at the protected site SRM recovery plan called ‘Recovery Plan 2 – Protection Group 2’ required to complete a partial site failover for the local data center vim22dc which is protected by SRM The protected VMs that will be failed over are app_vm7 through to app_vm12 from Protection Group 2 which is associated to the datastore group shared-san-2 While the simulated failover test is running, the status of each step that makes up the recovery plan can be monitored by going to Recovery Steps tab in the VI Client which will inform you what steps are currently Running as well as what steps were completed with a Success status. It is worth pointing out that there are some steps in a recovery plan that will only be executed during a simulated test, these steps are identified by ‘Test Only’ under the Mode column, there are also some steps that will only be executed during an actual failover, these steps are identified by ‘Recovery only’ under the Mode column Once the simulated failover test is completes a report of the test run can be viewed from the History Tab. The report can be viewed by clicking on the ‘view’ link. The report contains a list of all the steps in the recovery plan along with a status of ‘success or error’ and the duration of each step in the recovery plan * * SRM enables you to ‘Run’ a recovery plan which will result in the actual failover of virtual machines from the protected site The failover process via SRM is rapid, repeatable, reliable, manageable and auditable There are two ways to initiate the actual failover, you can either click on the ‘Run’ button or click on the ‘Execute Recovery Plan’ link under the Commands section If there is still connectivity back to the protected site at the time the disaster is declared by the business, SRM will first initiate the power down of the protected VMs at the protecte
您可能关注的文档
最近下载
- 市场营销原理(第13版) 科特勒 课件 中文版.ppt
- 陕西省全省性社会团体章程示范文本(陕西省2022版).pdf VIP
- 2025学年高一下学期期中考试物理试卷 Word版含答案 .pdf VIP
- 2023高考语文新课标I卷现代文阅读II《给儿子》小说精读及试题详解.docx
- 2025年许昌电气职业学院单招职业适应性测试题库往年题考.docx VIP
- 寿盒(骨灰盒)供应及售后服务方案.pdf VIP
- 适老化全场景技术规范 第2部分:既有居住建筑适老化改造技术标准 .pdf VIP
- 生态系统多样性及保护.pptx VIP
- (高清版)ZT 0331-2020 地热资源评价方法及估算规程.pdf VIP
- T∕CBMCA 057.1-2024 适老化全场景技术规范 第1部分:居住建筑适老化基本要求.pdf
文档评论(0)