- 1、本文档共60页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
船舶系泊试验大纲
TEST PROGRAM ONBOARD OF ELECTRIC POWER SYSTEM
General
Attendants
The test shall be conducted in compliance with the program and witnessed by presented of the surveyor of classification society and the owner’s representative, unless otherwise mentioned.
Testing condition
During testing, all the electric equipment shall be kept its service condition as near as practicable, and gauges fixed on the instrument board of equipment shall generally be used for checking and taking a record. Each test shall be carried out when the vessel is moored alongside the builder’s wharf, unless otherwise mentioned.
TEST PROGRAM
Electric Power System
Main diesel generators and Emergency generator
General
During test on board, in principle water resistance shall be used as test load (PF=1.0) except at sea trial or otherwise noted.
Insulation resistance test
Before and after the generator heat running test, insulation resistance between the following points shall be measured by use of a DC 500V Megger and it shall be confirmed that the resistance is 1 mega-ohm or above:
-Winding – ship’s hull
-Space heater – ship’s hull
The results of above test are recorded in attached sheets E-1, 2, 3, 4 on pages 15, 16, 17, 18.
Heat run test (Continuous load test)
Increase generator load gradually from zero to full and then run the generator continuously for 60 minutes under full load condition, 15 minutes under 110% full load at last.
Measure the following parameters and record the data during this test.
Output (kW), Frequency (Hz), Voltage (V), Current (A),
Temperature (℃) of Air, Frame, Stator, Bearing and Engine room.
It shall be confirmed that the generator is free from an abnormal rise of temperature at each part.
The temperature shall be measured by using of thermometer method.
The measurement points and results of measurement are recorded in attached sheets E-5, 6, 7, 8, on pages 19, 20, 21, 22.
Voltage characteristic test (Load characteristic test)
At a
文档评论(0)