CAF 变更管理.ppt

  1. 1、本文档共50页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* One big difference between this SREA and the prior SREA is that it is globally applicable. There is no longer a need to determine which plants the parts are being shipped to, to know if the SREA is applicable. The only exception is for at this time All other brands and regions require use of this SREA for production and service-unique parts. Any change after the first PPAP submission requires an SREA An SREA is required for anything that changes the manufacturing process or site location from what was originally approved through PPAP. An important lesson to remember here is that if a flexible line is used for the PPAP approval, and the proposed change is within the parameters of the flexible line of the original PPAP approval, then notification and an SREA are not required. This would include having multiple sources for a raw material or unfinished component – if the long term intention is to have multiple sub-suppliers, include them in the PPAP submission if possible and those sources of variation would have been included and changes to any one of the sources would not require an SREA submission. However, we understand that this is not possible all the time. * One big difference between this SREA and the prior SREA is that it is globally applicable. There is no longer a need to determine which plants the parts are being shipped to, to know if the SREA is applicable. The only exception is for at this time All other brands and regions require use of this SREA for production and service-unique parts. Any change after the first PPAP submission requires an SREA An SREA is required for anything that changes the manufacturing process or site location from what was originally approved through PPAP. An important lesson to remember here is that if a flexible line is used for the PPAP approval, and the proposed change is within the parameters of the flexible line of the original PPAP approval, then notification and an SREA are not required. This would include having

文档评论(0)

文档精品 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6203200221000001

1亿VIP精品文档

相关文档