- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
长输管道施工专业词汇
pipe alignment(setting out):
放线-即确定沿线路方向的管道实地安装的中心线位置,并划定管道施工界限的过程。 field hand over stake: 现场交桩-设计部门将所设计的管道控制桩、测量成果表及水准点资料在现场移交给施工单位。 right-of-way 路权-只有在得到土地所有者的书面授权下才能在该路段施工。 spread The crew and equipment required to build a pipeline from an untouched right-of-way to the commissioning stage of the pipeline. clearing 扫线-Members of the clearing crew transform the right-of-way into a suitable work area by clearing away land for the proposed route is in an area with no vegetation or encompasses an already cleared right-of-way,or corridor. grading 平整-The purpose of grading is to provide a smooth and even work area and to facilitate the movement of equipment onto and along the right-of-way. High-or-low -ground areas may require cutting down or filling in to achieve a more uniform grade for the pipeline. string 布管-把运到现场的管子,逐根地分布于管道沿线的组装场地上的过程叫“布管” line up 对口-按照规范要求,用专用器具将两端管子的管口对好 cutback 焊接预留区域- On pipe that has been mill coated ,a cutback of 6 to 9 inches is usually left at the end of the joint so that the coating does not interfere with the welding process. firing line(Welding Gang) 焊接组-一般指现场焊接流水机组In pipeline construction,the welding crew that takes over after the root pass and the hot pass have been made.The firing line is responsible for the filler pass and the cap bead,which complete the joint. cap bead 盖帽焊-是管口焊接的最后一道工序 tie-in 连头,碰死口-就是把焊接完的不能移动的管段连接起来 hot tie-in 动火连头-A weld made on a pipeline already in service. In the hot tie-in procedure, the gas from the line is purposely ignited at the point where the welding is to be done.Igniting the gas eliminates the chance that a spark could cause an explosion of gas and air. golden tie-in是机组与机组之间或者承包商与承包商之间的管段连接。 cover depth 埋深- The measurement from the top of a pipe to ground level along a right-of-way. egging(out of roundness) 失圆-管线焊接完毕后,要进行回填,如果回填不按照施工规范,一次回填过多或者焊接操作不当,导致管道变形了、不圆了 backhoe loader 反铲挖土机,两头忙- back-actor 反铲挖土机 bell hole 焊接操作坑A widened and sloped section of the ditch where welders will wor
您可能关注的文档
最近下载
- 银川市兴庆区2025届六上数学期末联考试题含解析.doc VIP
- 开放系统11879《小学语文教学研究》期末机考真题及答案(第103套).docx
- 110KV变电站设计 毕业论文.docx VIP
- 借款合同通用版.pdf VIP
- 再生水厂二期项目环评报批环境影响.docx VIP
- 2024-2025学年新疆维吾尔乌鲁木齐市沙依巴克区数学四上期末调研模拟试题含解析.doc VIP
- [浙江]浙江科技大学招聘19人(2024年第二批)笔试历年典型考题及解题思路分析附带答案详解.docx VIP
- 两层框架结构办公楼施工组织.doc VIP
- 2023-2024学年二年级数学上册期末乐考 非纸笔测试A方案 人教版.docx VIP
- 民族团结暨铸牢中华民族共同体意识教育.docx VIP
文档评论(0)