施工测量控制网的建立
Construction survey control network establishment
1.1 the building layout procedures and requirements
1.1.1 buildings lofting program
Lofting, also known as the measurement, which is in accordance with the requirements of design and construction, the building location, shape, size and height, in accordance with certain accuracy requirements on ground calibration, in order to carry out the construction. Essence is the drawing building some contour points ( points ) calibration in field, its purpose and general mapping work instead, from drawings to the ground.
Usually, the building design train of thought is: first make buildings overall arrangement, to determine the relationship between the position of the building (that is, the relationship between the building axis ), then around the main axis design the auxiliary axis, then according to the detail design of auxiliary axis location, shape, size etc..
Therefore, construction lofting work procedure, should and design when the situation, follow from local to the whole principle, namely the first on the scene set building axis, and then set out in all parts of the building. To take such a layout program, can be exempt from many buildings caused by lofting work disorder, and can keep the lofting element exists between the geometric relationship. For example, lofting industrial building, first staking out plant axis, and then determine the mechanical axis, then according to the mechanical axis, determine mechanical equipment installation position. And as the lofting lofting civil building, first building outline axis, and then determine the axis inside the building, and then according to the building interior each axis to determine the shape of the room, size etc..
1.1.2 building layout requirements
Building the main axis layout requirements, should be based on the nature of the building, it with existing building relationships and building area terrain ( mainly determines the size of projects ) and geology ( main build
您可能关注的文档
- 施工测量及沉降观测方案.doc
- 施工测量控制网的建立(修改稿).doc
- 施工测量施工方案.doc
- 施工测量基本知识.doc
- 施工现场一般安全技术措施.doc
- 施工现场临时用电管理制度汇编.doc
- 施工现场临用电接地与防雷安全技术交底.doc
- 施工现场危险部位预防监控和应急预案.doc
- 施工现场各主要工种安全技术操作规程.doc
- 施工现场土工试验方法(下)探讨与研究.doc
- 量化点评报告:ERP失效后,如何锚定A股价值?-20240123-国盛证券-10页.pdf
- 金融工程资产配置系列专题:基于“宏观预期”的权益择时系统与2024年股债组合构建展望-20240123-中银证券-15页.pdf
- 金融工程深度报告:如何从ETF的提纯Alpha中学习信息-20240122-东证期货-20页.pdf
- 家用电器行业跟踪报告:重仓持股比例续升,美的获增持-20240125-万联证券-10页.pdf
- 估值与基金重仓股配置监控:哪些行业进入高估区域?-20240120-天风证券-15页.pdf
- 中班教案《打针我不怕》3篇.pdf
- 中国考古发现黄金.pdf
- 第十七单元活血化瘀药.pdf
- 大学校区宿舍粉刷工程施工组织设计方案.pdf
- 医学护理三基试题14.8皮肤病性病护理学试题(护理).pdf
文档评论(0)