- 1、本文档共288页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ContractManagement
请将手机关机或调至静音状态 谢谢合作! Contract Management for International Construction Differences Focus Project management focuses on the efficiency, productivity of the execution of a project; Whereas contract management focuses on relationship between parties or their respective rights and obligations, responsibilities. Differences Objectives PM it to heighten the efficiency and productivity of a project team to complete a project within the time for completion, budget and satisfactory quality. CM however is to protect your own contractual rights and prevent yourself from breach of contract, meanwhile to discover your adversary’s defaults to claim against him. Differences Means PM, by means of working out a well-thought plan and carrying it out strictly by controlling the cost, time, and quality. CM, by familiarizing with the contract clauses so as to discover the adversary’s defaults easily. Procurement Methods of Construction Contracts In the construction industry, unlike other industries, there are many different procurement methods which can be adopted to contract a construction project. Different procurement methods respectively apply to different natures of project as well as the different employer’s requirements. General contracting Introduction Separation of construction from design A main contractor is employed to build what the designers have specified Traditional method, now for most construction contracts, though popularity of general contracting is waning Characteristics A main contractor in contract with the employer A main contractor in contract with trade (specialist) sub-contractors The contract is only responsible for construction (fabrication) not for design The contractor is to carry out the works shown and described in the contract documents. Certain items specified in the bills have to be done to the reasonable satisfaction of the architect (engineer, contract administrator) The contractor must comply with any instruction o
文档评论(0)