- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
StreamflowandRunoffThecharacteramountandtimingo
* * Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to hydrogeologist to identify how to create stream hydrographs from discharge measurements Measurement of discharge: Method used depends on type of study, size of river and flow, data requirements, etc. For small scale field studies discharge is measured over a cross-section at the point of interest using: a) float method - time surface float from point a to point b - average velocity is 0.85*surface velocity - mean velocity*x-sectional area = discharge - measurement distance should be ~10x stream width - very rough estimate b) stream gage - average velocity in a stream occurs at 0.368*depth above the bottom - therefore standard to measure along a cross-section at 0.4 depth off bottom - for more accurate estimates, averaging and depth measurements can be made.. c) dye dilution - good method for turbulent streams - need to use tracer that is a) easily soluble, b) have no or very low natural concentrations in stream, c) be conservative, d) easily detectable at low concentrations, e) ecofriendly, f) affordable - sodium chloride (NaCl) often used, and concentration/conductivity relation established - by introducing tracer upstream and measuring rate of concentration change downstream we can calculate discharge for the stream reach for a gulp injection where CT is the initial tracer concentration being introduced Cb is the background concentration in the stream and the integral in the denominator is evaluated graphically from a C vs. t plot.. d) direct measurement - can be used in small streams where it is possible to focus all flow into a collector More “Permanent” installations can be made using: a) - Dam (plate) with a v-notch (typically) that allows for controlled discharge through the notch. - discharge can be related to the height of the back-water - problems with sedimentation Rect
您可能关注的文档
- ProeNC数控加工.ppt
- Proe装配设计.ppt
- proe必掌握装配知识.ppt
- ProeNC数控加工2.ppt
- proe特征复制完全.ppt
- ProgressandplansforPPMintheSouthEastAsiaRegion.ppt
- ProjectManagement.ppt
- ProgrammingMultiCoreSystems.ppt
- ProjectProposalHMM小组.ppt
- ProjectprogressStudyontheEstablishmentofChinaGr.ppt
- 医疗器械创新设计项目智能制造方案(参考范文).docx
- 感恩教育主题班会PPT课件(带背景音乐 动态可修改).pptx
- 2024-2025学年天津市西青区七年级上学期期末考英语试卷含详解.docx
- 2.3资本结构决策.pptx
- 感恩教育主题班会PPT课件(带背景音乐 动态可修改).pptx
- 航空航天零部件加工项目智能制造方案.docx
- 小学英语四年级第一课时《at the farm》教育教学课件.pptx
- 2024-2025学年湖南省长沙市师大附中教育集团联考九年级上学期期末考试英语试卷含详解.docx
- 物流自动化仓储系统项目智能制造手册(模板).docx
- 纳米材料制备工艺项目智能制造手册(模板范文).docx
最近下载
- 20kV及以下配电网工程预算定额(2022年版)1_5册合集.xlsx
- 数学丨2025届T8联考(八省八校)高三第一次学业质量评价数学试卷含答案及解析.pdf
- 数学圆的思维导图.pdf
- 海洋碳汇经济价值核算方法2022.pdf
- 2024年四川普通高中会考数学真题.pdf
- 高中语文2023新高考文言文阅读专项练习(附参考答案).docx
- “双带头人”教师党支部书记工作室申报书.docx VIP
- 动脉采血临床操作指南PPT.pptx
- 2024年新高考英语必威体育精装版名校联考试题分类汇编10 单项选择题之情景交际(原卷版天津专用).docx VIP
- 2024年新高考英语必威体育精装版名校联考试题分类汇编5 单项选择题之主谓一致(原卷版天津专用).docx VIP
文档评论(0)