立井井筒施工组织设计方案.doc

  1. 1、本文档共161页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
立井井筒施工组织设计方案

摘要 梁宝寺二号井由肥城矿业集团公司投资兴建,矿址位于山东省嘉祥县,东南距嘉祥县城约20km。LiangBao temple no.2 shaft mining group company of feicheng invested in shandong province, ore addresses from jiaxiang county rizhao-heze expressway, southeast 20km about. Coal mine by international engineering group nanjing design institute design, production capacity of 12,000 Mt/a, Using vertical industrial field, the layout, and three vertical wind. This design includes three parts: the first part is the basic situation of the construction of coal mining area, including the general situation and the geological exploration and mining, coal mine, the main production systems, industrial square arrangement and ground building, mine construction main technical and economic indexes. The second part is LiangBao temple no.2 shaft construction organization tram wellbore bedrock, including the building construction preparation: well prepared, engineering technology, supplies and construction work to prepare, foreign cooperation, the surface of the vertical the construction organization design: freeze design (freeze depth, the determination of frozen wall surface), construction, tunneling, vertical section of the bedrock, the construction organization design: vertical bedrock section of the construction scheme, vertical bedrock tunneling (drill-blasting method using construction, including drilling and blasting equipment eye the selection of materials, the blasting parameters and blasting chart, to grasp the rock bolting, made with circular diagram and labor organization), and suspension, suspension system, the arrangement and changeless changeless flat beam structure and checking, hoist and steady vehicles arrangement, construction, auxiliary system safety technical measures, etc. The third part is the special parts: LiangBao temple no.2 shaft gets grouting technique of main shaft ground, including Wellbore survey controlling,Gets the grouting. Keywords: field exploit shaft construction drill blasting grouting eyes water.

文档评论(0)

店小二 + 关注
实名认证
内容提供者

包含各种材料

1亿VIP精品文档

相关文档