质量流量计介绍.ppt

  1. 1、本文档共46页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
质量流量计介绍质量流量计介质量流量计介绍质量流量计介绍

科氏力质量流量计介绍 什么是科氏力 Fc=科氏力 m= 质量 v = 质量流速 ?= 角速度 Fc = -2 m (? x v) 科氏力原理 If a person were standing at the center of a merry-goround and tried to walk in a straight line toward the edge, he or she would have to lean sideways against the Coriolis force to stay on line. The Coriolis force, Fc, can be calculated using the mass of the person′s body, M, the velocity of travel, V, toward the edge, and the angular velocity of the merry-go-round, ?. Fc = -2 m (? x v) TRIO-MASS DSP信号转换器 数据输入 通过三个组态按键 通过磁棒输入 显示 显示模块可按90°旋转 转换器表头旋转角度超过330° 科氏力质量流量计在各种行业的应用 TRIO-MASS DSP MC2 装配和安装 TRIO-MASS 装配和安装 TRIO-MASS can be installed vertical or horizontal the primary is to be installed in a rigid pipeline in case of strong pipeline vibrations, use elastic pipeline elements supports should be installed up- and downstream of the meter, (weight and influence of gas) if possible shut-off valves should be installed up- and downstream, (for zero adjustments) primary should not be installed in the vicinity of strong electromagnetic fields, (motors, transformers) fittings valves, gates and sigth glasses should not cavitate, TRIO-MASS does not require any flow conditioning primary should not come in contact with any other elements multiple flowmeter primaries in the same pipeline or installed in interconnected pipelines should be located far from one another, or, the pipeline must be ecoupled to prevent crosstalk at the outlet a back pressure of at least 0.2 bar must exist the primary should never be installed at the highest point in the system long drop lines downstream from the flowmeter primary should be avoided for fluids with gas content a vertical installation is recommended zero adjustments under operation conditions (completely filled meter, gas, operating temperature) TRIO-MASS 装配和安装 TRIO-MASS Assembly and Installation support and elastic pipeline elements TRIO-MASS 装配和安装 推荐安装方式 TRIO-MASS Assembly and Installation Horizontal Installation

您可能关注的文档

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档