幕墙测试计划书幕墙测试计划幕墙测试计划书幕墙测试计划书

2. FIELD WATER TESTING现场试验 2.1 Field water testing shall be carried out periodically during curtain wall installation.在幕墙安装期间定期进行现场喷淋试验。 Provide 3 successful water tests of each typical wall type. Locations to be selected by architect. 每种外墙安装期间定期进行现场喷淋试验。 All termination conditions, flashing to windows frames behind aluminum and cladding panels, coping/external balustrade shall be 100% tested. 所有收口位置与窗框相连的,在铝板后面的泛水板都需要100%的测试。 Should problems arise, the Architect may instruct that further testing be carried out. 如测试当中有任何问题出现,工程师可要求增加作实验范围。 The test shall be conducted strictly in accordance with AAMA-501.2 测试过程应严格遵循测试过程应严格遵循AAMA-501.2 Test area shall be at least two-story high and three-panel wide.This area should include all typical horizontal and vertical joints.The water shall be applied using a Type B-25,#6.030 brass nozzled with 1/2” FPT as manufactured by Monarch Manufacturing Works.The nozzle shall be used with a 3/4” garden hose.the water flow to the nozzle shall be adjusted to produce 30 to 35 psi water pressure.The nozzle shall be moved slowly back and forth above the joint,at distance of 1 ft from it,for a period of 5 minutes for 5 ft of joint. 测试区域至少为2层楼高,3个板宽,包括所有典型的横向和竖向接缝。淋水应采用铜喷嘴,型号如同Monarch Manufacturing Works Monarch Manufacturing Works生产的Type B-25,#6.030。喷嘴后接喷嘴后接3/4英寸的水管,水压应达30~35psi。 2.2 Gutter Test水槽测试 Verify during construction that water leakage and condensation are effectively collected and drained to the exterior. Test internal gutters for every floor by temporarily plugging weep holes and filling with water. After a minimum of fifteen(15) minutes,inspect for water leakage. Correct deficiencies and retest until successful tests are achieved. Remove weep hole plugs after testing.All gutters are to be clean and free of debris prior to installing additional material that would prevent access at a later time. Gutters shall be 100% tested. 在施工期间须检查渗漏雨水和冷凝水是否能够被完全排除室外。用临时堵住泄水孔并在内部水槽中灌水的方法来检查每一层楼的内部水槽的防渗漏性能。在保持15分钟以后,检查渗水状况。有缺陷的地方需要整改并重新测试直到

您可能关注的文档

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档