网站大量收购闲置独家精品文档,联系QQ:2885784924

steel structure and equipment after contact with pouring material surface.doc

steel structure and equipment after contact with pouring material surface.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Steel structure and equipment after contact with pouring material surface, the floating rust should be removed and sundry. Shall not be arbitrarily change the ratio of castable or optional in blended castable with water or other materials. (2) the key points of technical requirements in construction 1. Stir refractory castable water should use clean water. 2. Pouring with template should have enough stiffness and strength, the mould dimension should be accurate, and should prevent deformation in the process of construction. Template seams should be tight, do not leak slurry. The template anti-sticking measures should be taken. Contact with the castable insulation masonry surfaces, waterproof measures should be taken. 3. The castable forced mixer mixing should be adopted. Mixing time and the amount of liquid should be executed in accordance with the specifications. Change the materials brand, mixer, hopper, weighing container, etc. Shall be rinsed clean. 4. Refractory castable, mixture should be pouring completed in 30 minutes, or according to the specifications requirements within the prescribed period of time after pouring. Initial setting castable shall not be used. 1 P177 5. The overall casting refractory lining expansion joint setting, should according to the design rules. If it had no rules, per metre long lining expansion joint average value, can use the following data.. Clay refractory castable for 4 to 6 mm; High alumina cement refractory castable for 6 to 8 mm; Phosphate fire-resistant rao note material is 6 to 8 mm; Sodium silicate refractory rao note Portland cement refractory material for 4 to 6 mm rao note for 5 to 8 mm. 6. Pouring refractory castable, should be continuous. In the first layer castable, before initial setting should be the first layer castable after pouring; Intermittent more than the initial setting time, shall be handled according to the requirements of construction joints. Construction joints should be stay in the same row an

您可能关注的文档

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档