PossibleResponsestothe1998CADERReportandSitingand.ppt

PossibleResponsestothe1998CADERReportandSitingand.ppt

  1. 1、本文档共73页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PossibleResponsestothe1998CADERReportandSitingand

Energy Commission Staff Distributed Energy Resources Training Seminar California Energy Commission, Sacramento Jairam Gopal, Judy Grau, Pramod Kulkarniand Ean O’Neill April 13, 1999 DER Development and Implementation Issues Economic Technical Regulatory Planning/Policy Permitting Air Quality Economic Issues Installed costs Economies of scale vs. Economies of production Operations and maintenance (OM) costs Levelized cost -- busbar -vs- delivered More to come in next presentation General Technical Issues Lack of proven performance by newer technologies Lack of coordination with utility system operation Lack of comprehensive list of DER environmental and safety characteristics Impact of substantial DER on natural gas infrastructure Regulatory Issues AB 1890 Competition Transition Charge (CTC) for stranded investment costs Exit fees Non-discriminatory charges for standby, back-up and other utility services UDC planning, siting, and/or ownership of DER Expansion of net metering concept Planning and Policy Issues Lack of governmental policy support and coordination Omission of distributed resources from: air attainment plans general plans long-range energy infrastructure plans Some technologies are too small to trigger the “permit” threshold Permitting Issues Slow review, or denial, of distributed energy projects due to a lack of: consolidated, clear information on siting requirements universally accepted standards clearly defined impacts and benefits Permit overload? Maybe someday... Air Quality Issues Some technologies do not trigger permit thresholds or are otherwise exempt (e.g., emergency use only) Amount and types of DER penetration not known Cumulative impacts could be significant Possible consideration of output-based emissions standards Lack of Simplified Interconnection Capability Presented by: Ean O’Neill Associate Electrical Engineer Number One Barrier to Distributed Resources Lack of Simplified, Low Cost Interconnection Capability Stakeholders Utilit

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8010045112000002

1亿VIP精品文档

相关文档