- 1、本文档共3页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PROJECTMANGEMENTPLANEXAMPLESPrepareProjectSupportPlans
PROJECT MANGEMENT PLAN EXAMPLES
Prepare Project Support Plans and
Documentation -
Quality Assurance Plan Examples
Example 64
8.3 QUALITY ASSURANCE
This section describes policies and procedures that will be used to meet QA program objectives. This section also develops the
strategies PFP will use to ensure the SM of the PFP inventory, the material stabilization project, the deactivation project, and the
dismantlement of the PFP Complex buildings and are completed in a high quality manner.
8.3.1 QA Program
The QA program for the PFP Stabilization and Deactivation Project is implemented in accordance with the requirements of 10 CF R
830.120, Quality Assurance Requirements, (QA Rule) and HNF-PRO-260, Quality Assurance Program . The manner in which the
requirements are implemented is specified in QA program plans and implementing procedures for the PFP Complex. The QA
program is applied using a graded approach commensurate with the importance of activities to the success of the PFP Stabilization
and Deactivation Project.
8.3.2 QA Strategy
The PFP Stabilization and Deactivation Project activities will require a significant level of QA and quality control as stabi lization
operations, supporting material testing and characterization, and transition objectives are implemented. Examples where a high
degree of focus will be required include procedure compliance, data management, data verification, and continuous process
improvement.
Example 65
9 Quality Assurance Strategy
9.1 Introduction
A contractor will be responsible for the management, control, and oversight of the 771 Closure Project. The RMRS QA Plan (QAP P)
will be used to control and monitor the quality aspects of the project activities. The QAPP will describe roles, responsibilities, and
methodologies for ensuring compliance with DOE Order 5700.6C (the Order), and IO CFR 830.120, (Price-Anderson Amendments
Act, also known as the Rule). The 771 Closure Project will follow the req
您可能关注的文档
- 2016年第20批有毒化学品出口环境管理放行通知单申请审查明细表.pdf
- 2017届修读双学位同学申请推荐为双学位专业免试研究生的通知.pdf
- 2017年春季学生学位网上申请通知.pdf
- e-Advice&e-StatementApplicationForm(Form)电子通知书和电子月结单.pdf
- StatementAdviceReprintingApplicationForm对账单通知单补打.pdf
- E-DeliveryofStatementsAndAdvicesServiceApplicationForm.pdf
- 上海申达股份有限公司关于收到《中国证监会行政许可申请中止审查通知.pdf
- SEG未来酒店人——精英奖奖学金申请通知.pdf
- 个人客户短信通知注册(变更、注销)业务申请表.pdf
- 中科招商投资管理集团股份有限公司关于撤回定向发行申请取得中国证监会.pdf
文档评论(0)