- 1、本文档共92页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
薄膜工序标准化作业0816-1
薄膜标准化作业流程Thin film standard operation process每日上班前准备工作A day before work to prepare for work序号Serial number名称Name步骤Step图示Icon1第一时间查看交接班记录,确认交班人员是否有重要的事情交接The first time to see the log, confirm whether there are important things to shift personnel transfer 薄膜工序的机台异常情况; 薄膜工序安全状况;生产完成状况,是否有遗留待处理备注信息涉及较为重要的事项; 1) the abnormal situation of the film process; 2) film process safety status; 3) production status, whether there is a legacy left to deal with 4) note information to the more important issues; 2上班前使用干净无尘布沾酒精或IPA对工序工装、桌台、货架、推车进行清洁,做好6S。Before going to work, the use of clean cloth stained with alcohol or IPA on the working process, table, shelves, carts clean, do a good job 6S. 在二更拿取已清洗无尘布 在防爆柜领取酒精或IPA填写化学品领用记录按照从上之下,从里到外的原则对工装、器具、货架、推车等进行卫生清洁 清洁完毕后将无尘布放入待清洗盒中,领用的酒精或IPA放回防爆柜中,并更换干净手套。1) cleaning clean cloth in two to take more 2) in the explosion proof cabinet to receive the alcohol or IPA 3) fill in the record of the chemicals 4) according to the above, from the inside to the outside of the principle of equipment, equipment, shelves, carts and other sanitary cleaning 5) after cleaning, clean cloth in the box to be cleaned, and bring the alcohol or IPA back into the explosion-proof cabinet, and replace the clean gloves作业前确认事项 Confirmation before work 序号Serial number名称Name步骤Step图示Icon1核对本工序所有的机台状态牌是否与MES机台状态一致Check the status of all the machines in this process is consistent with the status of the MES machine 登录MES个人账户,进入机台管理中,选择薄膜区模组,点击查询即可。对薄膜工序所有的机台状态牌与MES系统中的机台状态进行核对,确认一致后方可流片。1) login MES personal account, into the machine management, select the film area module, click the query can be. 2) of state machine state licensing and MES system in the film process all check, confirm the agreement before can be taped.2填写作业前准备确认表Fill in the confirmation form 核对无误后,依照薄膜工序作业前准备确认表的要求进行填写After the check is correct, according to the requirements of the film process before the operation to prepare the confirmation form to fill in 机台监控及机台操作流程 Machine monitoring and operation pr
文档评论(0)