网站大量收购独家精品文档,联系QQ:2885784924

星河飯店给水排水设计稿毕业设计稿.docVIP

星河飯店给水排水设计稿毕业设计稿.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
星河飯店给水排水设计稿毕业设计稿

学 号 毕业设计说明书 济南市星河饭店给水排水设计 学生姓名 零桂萍 专业名称 给水排水工程 指导教师 穆 荣 环境与市政工程系 2006年 6 月 4 日 济南市星河饭店给水排水设计 摘 要 本设计为济南市一幢20层的综合楼,建筑总高度为73.8m。地上层,地下层Water Supply and Drainage Engineering Design of Xinghe Hotel in Jinan ABSTRACT This design is for a 20 floors integrative building in Jinan with a total height of 73.8m in which 20 floors is above the ground and one is basement. The basement is used for equipment with a height of 4.25m in which from the first floor to the third floor is shopping malls, 4th to17th floors is hotel rooms of 3.6 meters heights; 18th to 20th floors is used for apartment-style office. This design includes the water supply system design, the drainage system design, the hot-water system design, the hydrant water supply system design and the sprinkler system design. Water supply systems: the water supply model of this building is zoned water supply. There is no water apparatus in basement where do not need water supply. In this building, 1st~3rd floor is lower zone, which is down-feed mode directly supplied by the municipal water supply network; 4th~12th floor is the central zone which is down-feed mode supplied by frequency conversion governor pump; 13th~20th floor is high zone which is uplink and down water-supply mode supplied by water pumps and roof tanks. Drainage system: the drainage system of 4th-20th floor is separate mode for feces wastewater and other wastewater, including three standpipes and stack vent. The drainage system of 1st-3rd floor is combined system which is drained to the outside drainage system. Hot water system: This building uses a centralized hot-water supply system which consistent with water supply systems. 4th-12th floor is central zone and 13th-20th floor is high zone. As the points of distribution in 1st-3rd floor are less, there is not a hot water supply system there. Hot-water system in each zone is independent, using volume mode water heaters and concentrated layer equipment insta

您可能关注的文档

文档评论(0)

118books + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档