VDA6.3缺失项表格解读
KONE Supplier Validation Audit Report
Audit Location
Wujiang Juli
Audit Date
November 13, 2015
Audit Type
KONE Supplier Validation Audit
Audit Leader
Tom Yung
Audit Criteria
KONE Supplier Audit Checklist (ref. VDA 6.3:2010)
No.
VDA6.3
clause
Findings in diagnostic audit 审计中发现
(on July 2-3, 2015)
Score得分
(DA)
Validation audit result 验证审核结果
(on Nov. 13, 2015)
Photo file
no. [note]
Score
(VA)
1
2.1
APQP flow chart (JL-QP-35 8.0) did not define the responsibility who to identify customer requirements and link to marketing process (According to the drawing from customer, processing from where to start). The APQP procudure has no reference to the customer milestones, and could not reflect the synchronization of the work items in the PQP time plan,such as protype manufacture and prosess design. APQP流程图(jl-qp-35 8)没有明确责任谁来确定顾客的要求和链接到营销过程(根据客户的图纸加工从哪里开始)。APQP过程没有涉及重要阶段,并不能反映在PQP的时间计划工作项目的同步,如原型制造和工艺设计。
4
APQP flow chart had defined the responsibility of customer requirements review. The procudure has no reference to the internal and customer milestones. The procedure had included product design functions and the technical department only had process development.
APQP流程定义客户需求的责任审查。这个程序没有可供参考的内部和客户的重要事件。该过程包括产品设计功能,技术部门只有过程开发。
0342, 0343
4
2
2.2
In MAP2 Floor pedal development project,there was not a team list, and five from development department. No definition of each individual responsibilities, especially production capacity and logisticanalysis.For the project without design responsibility, the start points for team members with different responsibility was not defined in APQP procedure. 在MAP2踏板开发项目,开发部没有一个团队名单。每一个人的责任,没有明确的定义,特别是生产能力和物流分析。该项目没有设计责任,团队成员各自责任的起始点不在APQP过程定义。
6
The procedure had definition of the functions of each project team members, it did not include quality, technical development and capacity planning functions. The project leader had not been designated with sufficient authority and top management support. 该程序定义了每个项目团队成员的功能,它不包括质量、技术开发和产量
您可能关注的文档
- Unit1_UniversityStudent_Life(2015第二版)解读.ppt
- UG_模具加工解读.ppt
- unit06模板与数据结构解读.ppt
- UNIX系统应用与维护解读.doc
- Unit7SeasonsReading1课件ppt解读.ppt
- 检验与临床的沟通及案例-副本讲述.ppt
- Unit2Myschoolbag我的书包解读.ppt
- 常见网络攻击与防御精要.ppt
- 检验科各科室工作流程讲述.doc
- 检验科:药敏实验结果演示文稿讲述.pptx
- 《民法典》对建设工程合同的立法调整及其对《建筑法》修改的影响.pdf
- 五年级上册数学期末试卷及答案精选.pdf
- 【2019-2020高一数学试题】高一数学必修4《三角函数的定义》 及答案解.pdf
- 《心理学》试题库及答案.pdf
- 《幼儿园手工制作》期末试卷及其答案.pdf
- C456002【强化】2024年陕西中医药大学1054护理《308护理综合之基础护理.pdf
- 《CADCAM技术》复习提纲整理汇总.pdf
- Allegro高级教程-17个步骤让你掌握 .pdf
- [精品]2019年高考政治一轮复习专题25文化创新(押题专练) .pdf
- C689021【冲刺】2024年浙江中医药大学1005Z2中医药信息学《624医学信 .pdf
文档评论(0)