- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
关于斜拉桥的中英文翻译 大学学位论文
Study on nonlinear analysis of a highly redundant cable-stayed bridge
1.Abstract
A comparison on nonlinear analysis of a highly redundant cable-stayed bridge is performed in the study. The initial shapes including geometry and prestress distribution of the bridge are determined by using a two-loop iteration method, i.e., an equilibrium iteration loop and a shape iteration loop. For the initial shape analysis a linear and a nonlinear computation procedure are set up. In the former all nonlinearities of cable-stayed bridges are disregarded, and the shape iteration is carried out without considering equilibrium. In the latter all nonlinearities of the bridges are taken into consideration and both the equilibrium and the shape iteration are carried out. Based on the convergent initial shapes determined by the different procedures, the natural frequencies and vibration modes are then examined in details. Numerical results show that a convergent initial shape can be found rapidly by the two-loop iteration method, a reasonable initial shape can be determined by using the linear computation procedure, and a lot of computation efforts can thus be saved. There are only small differences in geometry and prestress distribution between the results determined by linear and nonlinear computation procedures. However, for the analysis of natural frequency and vibration modes, significant differences in the fundamental frequencies and vibration modes will occur, and the nonlinearities of the cable-stayed bridge response appear only in the modes determined on basis of the initial shape found by the nonlinear computation.
2. Introduction
Rapid progress in the analysis and construction of cable-stayed bridges has been made over the last three decades. The progress is mainly due to developments in the fields of computer technology, high strength steel cables, orthotropic steel decks and construction technology. Since the first modern cable-stayed bridge was built in Sweden in 1955, their
您可能关注的文档
- 二级圆柱齿轮减速器设计 大学学位论文.doc
- 二级减速器设计说明书 大学学位论文.doc
- 二手网莆院站计划书大学学位论文.doc
- 发电厂2x330mw化学运行规程 大学学位论文.doc
- 发电厂电气部分大学学位论文.doc
- 发动机拆装实验台设计大学学位论文.doc
- 发动机曲轴加工工艺分析与设计大学学位论文.doc
- 发动机箱体结构设计及加工路线拟定大学学位论文.doc
- 法学论文浅论未成年人犯罪的原因及防治措施 大学学位论文.doc
- 凡客诚品大赛方案 大学学位论文.doc
- 4.1 陆地水体及其关系 课件高二上学期地理中图版(2019)选择性必修一.pptx
- 混凝土结构与砌体结构设计习题集 .pdf
- 统编版语文四年级下册 22.古诗三首 课件(共50张PPT).pptx
- 青海2024行测笔试真题及答案 .pdf
- 2.1 充分发挥市场在资源配置中的决定性作用 课件-高中政治统编版必修二经济与社会.pptx
- 27.巨人的花园 课件(共58张PPT).pptx
- 统编版语文一年级下册5 树和喜鹊 第1课时 课件(共37张PPT).pptx
- 2.1 充分发挥市场在资源配置中的决定性作用 课件政治一轮复习统编版必修二经济与社会.pptx
- 贵港市平南县2024届小升初考试语文试卷含答案 .pdf
- 小学期末考试质量分析 .pdf
文档评论(0)