Q1_2nd_Edtion_Rules_Ref_Card.pdf

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Q1_2nd_Edtion_Rules_Ref_Card

Q1 2nd EDITION RULES REFERENCE CARD Q1 2nd EDITION RULES REFERENCE CARD July 28, 2004 CONTENTS  Introduction  Q1 Requirements  Q1 Score o Manufacturing Site Assessment o Capable Systems o Ongoing Performance o Violation of Trust  Q1 Certification Process Status Codes  Applying for Q1  Correcting Data Issues  Updating Information  Web Sites for Additional Information Introduction This booklet is intended to serve as an aid in the understanding of the Q1 requirements and scoring rules as applied in SIM. Q1 Requirements Site Eligibility  Site must be an external manufacturing location of production or service parts  Sites must be assigned to a STA site engineer who is responsible for verifying Q1 eligibility  Site must be shipping for at least 6 months General Q1 Rules  Q1 Score baseline is 1000  Scoring adjustments are based on: Manufacturing Site Assessment, Capable Systems, Ongoing Performance and, where applicable, Violation of Trust.  Q1 score must be at least 800 points to maintain Q1. A Q1 Supplier with a score below 800 points will be recommended for Q1 Revocation.  If a -250 point score occurs for any metric, positive points are not applied from any other metric.  A site that is either Production or Service STA active and missing correspondence PPM data for the last 13 months of delivery data for the last 7 months, will have N/A displayed in the site Q1 Information screen.  Any N/A situation will result in an Incomplete Q1 score. Incomplete only means missing data but does not necessarily mean poor performance.  When a site is assigned Production and Service STA, the Production STA Site Engineer has the Q1 process lead. However, the two engineers must collaborate on Q1 status decisions.  Q1 Scoring is updated with the SIM Refresh mid-month. Q1 Scoring is not updated between these refreshes. The information

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档