- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Application of Multicriteria Analysis to select the best highway alignment
TUNNELDESIGN
Application of Multicriteria Analysis to Select the
Best Highway Alignment
G. S. Kalamaras, L. Brino, G. Carrieri, C. Pline, and P. Grass0
Abstract -Selecting the optimal alignment is a multi-disciplinary decisionproblem, with objectives which
may conflict with one another. The approach selected for resolving this problem in a quantitative manner,
is the Multicriteria Analysis, where ratings are attributed to different objectives, for the alternatives
analyzed. The following principal objectives were considered for the highway project under consideration:
minimization of the impact on the environment, optimization of the functionality of the alignment (also, in
terms of safety), minimization ofconstruction time (with respect to the go-month deadline), minimization of
construction and operational costs, and maximization of the results of the economic inuestment. In order to
perform an evaluation of the possible alternatives it was necessary to breakdown these objectives into a set
of corresponding criteria. Definition of a weighting factor for each criterion, signifying the importance of the
criterion in the decision makingprocess, was done bypair-wise comparison, quantitative criteria and experts’
judgment. A rating system was defined for evaluating the performance of each alternative solution.
Minimization of construction time and minimization of construction and opemtional costs are amongst the
criteria with the highest weighting factors in selecting the optimal alignment. The software chosen for
providing the hard data for this comparison was DATISIMSUPER. Due to the complexity of the alignment
(viaducts, tunnels, normal road sections), a very large network ofconstruction activities had to be set up. The
selected alignment was that of alternative A5 since, apart from being associated with low construction cost
and ti,me, it was also associated with a favombleperformance with reference to the otherprincipal objectives:
impact on t
您可能关注的文档
- A Nice Breakfast.ppt
- A Note on Garden Path Sentences in Chinese-Thomas Hun-tak Lee.pdf
- A Novel Magneto-fluorescent Nano-bioprobe for Cancer Cell Targeting, Imaging and Collection.pdf
- A patient with de novo tuberculosis during anti-tumor necrosis factor-alpha therapy illustrating.pdf
- A Novel Ship Wake CFAR Detection Algorithm.pdf
- A novel method of quantitative risk assessment based on grid difference of pipeline sections.pdf
- A predictive risk index for safety performance in process industries未打印.pdf
- A Probabilistic Approach to Compound Noun Indexing in Korean Texts.pdf
- A New Ice Age【小卒过河】.pdf
- A Queueing Network Model of Patient Flow in an Accident and Emergency.pdf
文档评论(0)