- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Data Mining on Prices of Highway Project Main Material Based on WEB
Data Mining on Prices of Highway Project Main
Material Based on WEB
Jie He Yikai Chen Wen Hang Zhiguo Qi
Transportation College, Southeast University, Nanjing 210096, P. R. China
Abstract
The management of main material prices of
provincial highway project quota has problems
of lag and blindness. Framework of provincial
highway project quota data MIS and main
material price data warehouse were established
based on WEB firstly. Then concrete processes
of provincial highway project main material
prices were brought forward based on BP neural
network algorithmic. After that standard BP
algorithmic, additional momentum modify BP
network algorithmic, self-adaptive study speed
improved BP network algorithmic were
compared in predicting highway project main
prices. The result indicated that it is feasible to
predict highway main material prices using BP
NN, and using self-adaptive study speed
improved BP network algorithmic is the
relatively best one.
Key Words: Highway project main material,
Data mining, WEB, BP neural network
1. Introduction
Low managing efficiency, long updating cycle
and difficult in decision support are general
problems in highway project management in
China. For highway project management in
province, these problems are especially
prominent, becoming one of the most difficult
problems in project fund management. These
problems also have indispensable negative
effects on projects’ economic and social benefits
[1]-[2]. Since that, this thesis analyzed the
framework of provincial highway project
integrate MIS and the construction of database,
data warehouse at first, based on which studied
the application and implement of data mining in
highway project main material prediction.
Finally overcome the lag and blindness of
highway project main material management,
enhanced highway project finance management
efficiency.
2. Data Collection and
Management Based on WEB
2.1. Framework of data manag-
ement syst
您可能关注的文档
- Charm Mixing - Theory.pdf
- Charm meson resonances and D to V semileptonic form factors.pdf
- Charm mixing from BABAR.pdf
- Charm of small $x$ neutrino DIS.pdf
- Charm particle production in hadronic collisions.pdf
- Charm (and Beauty) Production at the Tevatron.pdf
- Charm Physics with BES-III at BEPC-II.pdf
- Charm quark mass dependence of the electromagnetic dipole operator contribution to anti-B -.pdf
- Charm production in deep inelastic and diffractive scattering.pdf
- Charm Semileptonic Decays.pdf
文档评论(0)