IET - Breakfast Briefing - December 7th 2010.pdf

IET - Breakfast Briefing - December 7th 2010.pdf

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IET - Breakfast Briefing - December 7th 2010

Greater Gabbard The World’s Largest Offshore Wind Farm In Construction Presentation to IET Dublin - December 7th 2010 by Séamus Mc Cabe 2Agenda ? SSE – Who are we? ? The Greater Gabbard Offshore Windfarm Project ? Foundations and Transition Pieces ? Design ? Installation ? J-tubes ? The Future Challenge SSE Renewables - Who are we? 30th largest company in the FT-SE 100 Electricity Gas Networks £4.7bn RAV 2nd largest Energy Supply (GB Ireland) 9.2 million customers 2nd largest Generation (UK) Over 11,000MW 2nd largest Renewable Generation (wind, marine hydro, biomass) Largest in the UK Over 2,300MW Over 450MW in operation in Ireland Safety Service Efficiency Sustainability Excellence Teamwork The Greater Gabbard Experience 5Greater Gabbard Offshore Windfarm Project ? UK Round 2 Project – Awarded 2004 ? SSE/RWE joint development ? 504 MW Offshore Wind Farm ? Project Site ? Outer Thames Estuary, U.K. ? 12 nautical miles (25 km) offshore ? Site area: 147km2 ? Water depth: 20 to 32 metres ? 140 Turbines, 2 Offshore Platforms Greater Gabbard – Project Lifecycle ? Development (2003 -2004) ? Design (2004 – 2008) ? Construction Installation (2009 – 2011) ? O M, Decommissioning (2011 – 2035??) Site selection property arrangements Wind resource assessment Windfarm layout Consents and Licences Design Engineering Contracting Strategy Turbine Procurement BOP Financing / PPA Monopiles and Transition Pieces Offshore Substation Wind Turbine Generators Electrical Cables (Inter-array and Export) Onshore Substation Grid Connection Turbine Maintenance BOP Maintenance Transport and Accessibility Decommissioning November 2010 – Largely Complete Ongoing Works Construction Risk mitigated through contracting strategy Turbine Supply Balance of Plant Grid Contractor Siemens Fluor National Grid Scope Covers supply commissioning of turbines Covers turbine installation, vessels, onshore works, offshore substation, cabling

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档