- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
山东电力设备有限公司
Shandong Power Equipment
Company
安装使用说明书
Installation and Operation Manual
1DS.711.0923.AS
SFP-260000/330
1 主体起吊运输
1. Hoisting and transportation of main body
1.1变压器油箱为桶式结构,油箱的起吊和主体的起吊见变压器外形图,吊绳和铅垂线的夹角不应大于300,否则应用平衡梁起吊;起吊主体时要同时使用所有的4只吊拌,所有吊绳的长度应相匹配,受力必须均匀,严防主体偏倒,油箱上的千斤顶支架供顶起变压器主体用,顶起主体时要同时使用所有的8个千斤顶支架。8个千斤顶要同步升降,严防主体倾斜和翻倒。
1.1 Oil tank of transformer uses upper flange structure, hoisting of upper oil tank and hoisting of main body are shown in outline drawing of transformer, included angle between hoisting rope and plumb line shall not be more than 300, otherwise balance beam shall be used for hoisting; when hoisting main body, all of four lifting lugs shall be used at the same time, length of all hoisting ropes shall be the same and their bearing force shall be uniform, tilting and tipping of main body are strictly prohibited, jack support on lower oil tank is used for jacking up main body of transformer, all of eight jack supports shall be used at the same time when jacking up main body. Eight jacks shall rise and drop synchronically, tilting and tipping of main body are strictly prohibited.
1.2 变压器主体尽量充油运输,运输前拆除的外部大型组件有:高压套管、低压套管、中性点套管及接地套管,冷却器及其与主体的连接管、导气联管、压力释放阀、储油柜及升高座等。
1.2 Main body of transformer shall be transported after filling oil as far as possible, large external parts that shall be moved before transportation are high voltage bushing, low voltage bushing, neutral point bushing, ground bushing, cooler and connection pipe between cooler and main body, gas connection pipe, pressure relief valves, oil conservator, turrets base and so on.
高压引线电缆用白布带固定在附近的引线支架上, 油箱上部定位钉全部拧紧,变压器注油到离拱顶200mm。
High voltage leading cable is fixed on nearby leading wire bracket by white cloth stripe, upper part of oil tank is tightened by positioning pin, transformer shall be added oil to 200mm below the vault.
1.3 变压器主体充氮运输时(因运输及卸车等条件受限),主体不带油,只在箱底留有部分残油,充以干燥的氮气,其压力为(20~30)kPa,纯度≥99.99%,露点≤-35℃。在变压器运输过程中氮气压力不得低于10kPa,并随时补充注入符合上述要求的氮气。
1.3 When main body of transfo
文档评论(0)