设计速度60kmh二级公路_毕业论文.doc

  1. 1、本文档共78页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
设计速度60kmh二级公路_毕业论文

摘 要 辽宁省滨海公路工程CE段全长14.767km。公路所经地区为滨海平原区,全线采用双向双车道二级公路标准设计,路基宽度10米,设计行车时速60km/h。 全线设平曲线14个,线形组合均采用基本型,平曲线最小半径270.028m;设竖曲线29个,其中最大竖曲线半径11207.593(m),最小竖曲线半径2000(m),最小纵坡0.301%。路线采用的技术指标可以较好的满足该二级公路的通行要求,达到二级服务水平。由于路线跨越河流、风景区,故设大桥三座、挡土墙一道。同时,综合考虑地形、土质和水量等完成了道路排水系统的设计,路基防护主要采用挡土墙和草皮防护,路面设计为沥青混凝土路面。 本设计重视环境保护,尽量使道路与周围环境协调统一。 设计中采用多种工程软件进行精确计算来优化设计,设计图纸采用AUTOCAD及Roadleader软件绘制。 关键词:二级公路;挡土墙;沥青路面;预应力T型梁桥桥;边坡防护。 ABSTRACT The total length of Liaoning province coastal road CE section is 14.767 km. The area which the road crosses is coastal areas. And a technical standard of double-way two-lane Secondary road is adopted in the design. The design speed is 60km/h. The width of the subgrade is 10 meters. The basic type of horizontal curve is adopted in this design for all the 14 horizontal curves and its minimum radius is 270.028m. Two vertical curves are designed and its minimum radius is 2000m and 2000m for convex vertical curve and concave vertical curve respectively. The minimum longitudinal grade is 0.301% which meet the drainage. All of the adopted technical standard can meet the B road with the second-class service level. 3 bridges are designed, which are three large bridges are designed.Different kind of drainage facilities are used in the drainage design. Gravity retaining wall and Mortar rubble are used for the slope protection. The asphalt concrete is used on pavements in this road. The concept of environmental protection is carried through in all the design to make the road consistent with the nature. Different kinds of professional software are used to optimum the design result. The construction documents are completed by AUTOCAD and Roadleader. Key words: two highway; retaining wall; asphalt pavement; prestressed T girder bridge; slope protection. 目录 第1章 绪论 6 1.1 设计资料 7 1.1.1气候特征 7 1.1.2地形与地貌 7 1.1.3地质与土质 7 1.1.4植被覆盖与作物等情况 7 1.2 道路等级的确定 8 1.3 可行性分析及总体设计原则 8 1.3.1可行性分析 8 1.3.2总体设计原则 9 第2章 公路选线 10 2.1 选线原则 10 2.2 线形与技术标准 10 2.3 路线与桥位的配合 11 2.4 路线设计方案 11 2.4.1路线设计

您可能关注的文档

文档评论(0)

店小二 + 关注
实名认证
内容提供者

包含各种材料

1亿VIP精品文档

相关文档