施工承包商规范资料.docx

  1. 1、本文档共44页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GLOBAL CONSTRUCTION SPECIFICATION 01100全球施工规范 01100TABLE OF CONTENTS:目录:Section Page章节 页1.0 Ownership, Control, and Review 所有权、控制和评审A. This standard is owned by the Global Construction Safety Process Review Board (GCSPRB). 本标准由“全球施工安全工艺审查委员会”(GCSPRB) 拥有。B. Questions related to the correct application or interpretation of this global standard should be directed to the Global Construction Safety Manager. 有关对此国际标准的正确应用或解释方面的问题应提交全球施工安全经理。C. Questions associated with local issues of application or interpretation should be directed to the responsible Regional Health and Safety (HS) Manager. 地方上有关对应用或解释方面的问题应直接提交至负责的地区健康和安全(HS)经理。D. Requests for changes to this standard must be made to the Global Construction Safety Manager. This standard will be reviewed every five years from the effective date or when significant changes occur to Company policy, external regulations, or standards that are the basis for this standard.对此标准进行修改的要求必须提交至全球施工安全经理。此标准自有效日起每五年作一次评审,如果公司政策、外部规章或此标准以之为基础的标准发生重大改变,则将提前予以评审。E. Deviations to this document shall be submitted in writing to the Global Construction Safety Manager along with supporting documentation for alternative procedure and/or practices that provide at least equal or superior protection for the affected parties. Requests will be reviewed by the Global Construction Safety Process Review Board, and a written decision will be returned. If an immediate action is required, the Global Construction Safety Manager will be contacted. If unavailable, the Plant Safety Engineer with concurrence from the Regional Health and Safety Manager may temporarily implement the action until a decision from the GCSPRB is received. A written response on the deviation request shall be provided to the requesting organization as soon as practical.与此文件的差异应以书面形式提交至全球施工安全经理,并随同一起提交支持文件,对于受影响部分提供至少相同或超越保护的替代工艺和/或实践。全球施工安全工艺审查委员会将对差异要求进行评审,并将决定以书面形式传达。如果需要立即采取措施,则会与全球施工安全经理取得联系。如果联系不到,工厂安全工程师与地区健康与安全经理可以暂时采取措施

您可能关注的文档

文档评论(0)

希望之星 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档