establish measuring control network.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
establishmeasuringcontrolnetworkestablishmeasuringcontrolnetwork

establish measuring control network; 2, set the vertical and horizontal centerline; 3, set the elevation benchmarks; 4, setting settlement observation point; 5, installation process measurement control; 6, the measured records, etc. Six figure drawing, engineering survey completion (a) the purpose of drawing completed master plan Completion is the total floor plan design master plan in the construction of the fully reflect the actual situation after, so design master plan cant completely replace the total plan completion. The purpose of compilation completed master plan: (1) in the construction process may be due to the design without considering the problems and make the design change, this kind of temporary change design must be completed by measuring the reflection to the total floor plan; (2) it will facilitate later for a variety of facilities maintenance work, especially the underground pipeline take cover engineering inspection and maintenance work; (3) the expansion of for the enterprise provides the original buildings, structures, and on the ground, underground pipeline and traffic line coordinates and elevation data. New business completed total floor plan compilation, preferably with engineering gradually completed successively for compilation. Completion and use of completion measurement results compilation site plan completion. If any problem found the location of the underground pipeline, may at any time to check and make record drawings can reflect the actual situation. Completed the advantage of compilation is: when business is completed, completion of the total floor plan also completed most of the compilation, can be used as completion of acceptance of the data, and can greatly reduce the measured workload, save manpower and material resources. Completion of site plan compilation, including both measured data compilation and indoor and outdoor. (2) measurement record drawings 1. Mechanical and electrical engineering survey record draw

文档评论(0)

ganqludp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档