- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献原文及翻译
外文文献原文及翻译
学生姓名: 徐**
学 号: 209****17
专 业: 工程造价
指导教师: * *
?
?
?
2017年3月14日
外文文献原文
FACTA UNIVERSITATIS
Series: Architecture and Civil Engineering Vol. 4, No 2, 2006, pp. 85 - 89
CIVIL ENGINEERING PROJECTS REALIZATION
MANAGEMENT
UDC 725.4(045)=20
Slobodan Mirkovi?
University of Ni?, Faculty of Civil Engineering and Architecture, Serbia
Abstract. The paper treats the management of the realization of civil engineering projects or civil engineering buildings construction management, as a complex dynamic process, which entails a large number of strategic and operative decisions which are important for an efficient, cost effective, and economic construction. The management process execution is not possible without the functions such as planning, organizing, coordination and control. Planning, as the initial function, important for the forecast of the future events, tasks and goals, is rendered much simpler by the application of computers and software packages. Such software packages facilitate the integral management, planning, realization, as well as control of the course of realization of civil engineering projects, that is the entire course of civil engineering buildings construction. The most frequent programs in this application are the Scheduler, Prima Vera and Project. The experience acquired in the application of these software packages has shown that the best results in civil engineering have been attained by the software package PROJECT 2003.
Key words: Project, software packages, management process, organization project and building technology.
1. INTRODUCTION
Starting from the fact that the realization of civil engineering projects or construction of civil engineering buildings is a very complex dynamical process, affected by an extremely large number of factors which are constant or stochastic in character, it can be stat
您可能关注的文档
- 培养孩子热爱阅读的十妙招.docx
- 培养学生良好的习惯是科学教学关键(襄阳古驿镇黄渠河第二小学陈兵.doc
- 培养自信心论文.doc
- 培训的分类与方法.doc
- 基于Arduino的遥控播放系统设计.docx
- 基于C的酒店管理系统.doc
- 管理沟通论文企业危机公关的处理与反思.doc
- 管理的实践—提升管理绩效的行为密码王晓慧.doc
- 基于MCGS和PLC的机械手控制系统设计_机电一体化技术专业毕业设计_毕业设计.doc
- 管理科学与工程专业博士研究生培养方案201312.doc
- 2024年学校党总支巡察整改专题民主生活会个人对照检查材料3.docx
- 2025年民主生活会个人对照检查发言材料(四个带头).docx
- 县委常委班子2025年专题生活会带头严守政治纪律和政治规矩,维护党的团结统一等“四个带头方面”对照检查材料四个带头:.docx
- 巡察整改专题民主生活会个人对照检查材料5.docx
- 2024年度围绕带头增强党性、严守纪律、砥砺作风方面等“四个方面”自我对照(问题、措施)7.docx
- 2025年度民主生活会领导班子对照检查材料(“四个带头”).docx
- 国企党委书记2025年度民主生活会个人对照检查材料(五个带头).docx
- 带头严守政治纪律和政治规矩,维护党的团结统一等(四个方面)存在的问题整改发言提纲.docx
- 党委书记党组书记2025年带头增强党性、严守纪律、砥砺作风方面等“四个带头”个人对照检查发言材料.docx
- 2025年巡视巡察专题民主生活会对照检查材料.docx
文档评论(0)