网站大量收购闲置独家精品文档,联系QQ:2885784924

中型灌区干渠渠首水闸设计设计.doc

  1. 1、本文档共142页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中型灌区干渠渠首水闸设计设计

扬州大学本科生毕业设计 PAGE  PAGE 137 摘 要 本闸位于江苏省高邮市某中型灌区干渠渠首,为渠首取水水工建筑物。建筑物等级为一级。计算得本工程设3孔,每孔净宽5.0m,闸底板长17m,闸底板厚1.0程采用平面钢闸门,采用QPQ-12.5的单吊点卷扬式启闭机。经计算设计消力池长为15m,深1.0,消力池底板厚为0.5m,海漫长为20m。上下游翼墙结构形式采用钢筋混凝土扶壁式挡土墙。 本工程中防渗计算采用改进阻力系数法,底板内力按弹性地基梁法计算。本工程设计主要由水力设计、消能防冲设计、闸基渗流计算、闸室结构布置、闸室稳定计算、闸室结构计算、两岸连接建筑物布置、两岸连接建筑物结构计算等几个部分组成。 关键词:水力计算 稳定计算 结构计算 边荷载 弹性地基梁 Abstract This floodgate located at Jiangsu Province Gaoyou some medium irrigation area main channel canal head, takes the water hydraulic engineering structure for the canal head. The building rank is first-level. Calculates this project to suppose 3, each extends 5.0m only, floodgate ledger wall long 17m, floor or bottom of sluice gate thickness of slab 1.0m. This project uses the plane steel strobe, uses QPQ-12.5 Shan Disodium to hoist the type gate. After the computation design toe basin length is 15m, deep is 1m, the toe basin bottom thickness of slab is 0.5m, and the sea long is 21m. The upstream and downstream wing wall structural style uses the reinforced concrete buttress type bulkhead. In this project the anti-seepage computation uses the improvement resistance method of correlates, the ledger wall androgenic force according to elastically the foundation beam law computation. the this engineering design mainly by the water power design, disappears can against flush the design, the floodgate base transfusion computation, the brake chamber structural arrangement, the brake chamber stable computation, the brake chamber structure computation, both banks connection building arrangement, both banks connection building structure computation and so on several parts to be composed. Key word: Water power computation stable computation structure computation load elastically foundation beam 毕业设计(论文)原创性声明和使用授权说明 原创性声明 本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。尽我所知,除文中特别加以标注和致谢的地方外,不包含其他人或组织已经发表或公布过的研究成果,也不包含我为获得 及其它教育机构的学位或学历而使用过的材料。对本研究提供过帮助和做出过贡献的个人或集体,均已在文中作了明确的说明并表示了谢意。 作 者 签 名:       日  期:        

您可能关注的文档

文档评论(0)

2017ll + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档