- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
掘进机毕业设计---外文翻译
英文原文
Abstract
The factors affecting the performance of 90 kW-shielded roadheader is investigated in detail in a tunnel excavated for NuhCement Factory. The first part of the tunnel is horizontal and the second part is inclined with 9_ and excavated uphill. Tunnel passes through a formation of the Upper Cretaceous age with nodular marl, carbonated claystone, thin and thick laminated limestone. Water ingress changes from 0 to 11 l/min. In six different zones it is found that the rock compressive strength changed from 20 to 45 MPa, tensile strength from 1 to 4 MPa, specific energy from 11 to 16 MJ/m3, plastic limit from 15% to 29%, liquid limit from 27% to 43% and water absorption from 4% to 18% in volume. Detailed in situ observations show that in dry zones for the same rock strength the inclination of the tunnel and the strata help to increase the instantaneous cutting rate from 10 to 25 solid bank m3/cutting hour. The effect of water on cutting rate is dramatic. In the zones where the plastic limit and the amount of Al2O3 is low, instantaneous cutting rate increases from 34 to 50 solid bank m3/ cutting hour with increasing water content from 3.5 to 11 l/min. However, in the strata having high water absorption characteristic and high amount of Al2O3, cutting rate decreases considerably due to the sticky mud, causing problem to the cutterhead. Excavation, muck loading and support works are performed separately due to safety concerns in the wet and inclined sections which reduced the machine utilization time from 38% to 8%. The information gathered is believed to form a sound basis in contributing the performance prediction of roadheaders in difficult ground conditions. _ 2004 Elsevier Ltd. All rights reserved.
Keywords: Tunnel excavation; Roadheader performance prediction; Core cutting test; Specific energy
Introduction
The application of roadheaders in difficult ground conditions, in recent years, has increased considerably in both civil and mining engineering fie
文档评论(0)