- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BC电子商务物流配送模式分析以苏宁易购带为例
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled.
您可能关注的文档
- +义务教育实施细则.doc
- ,不合格账户或成批提前中止交易.doc
- ,应化标准团支部申请材料.doc
- A 决胜终端 提升业绩2.doc
- Acrel用户变电站综合自动化系统.doc
- Acrel电力监控系统在青岛橡胶谷的应用方小燕.doc
- AEG UPS电池的储存安装和维护.doc
- APB税控器网报流程操作流程.doc
- App 暖通专业风管水管材料一览表.doc
- a文化宜化 宜化文化赵小红.docx
- 2024年中国钽材市场调查研究报告.docx
- 2024年中国不锈钢清洗车市场调查研究报告.docx
- 2024年中国分类垃圾箱市场调查研究报告.docx
- 2024年中国水气电磁阀市场调查研究报告.docx
- 2024年中国绿藻片市场调查研究报告.docx
- 2010-2023历年初中毕业升学考试(青海西宁卷)数学(带解析).docx
- 2010-2023历年福建厦门高一下学期质量检测地理卷.docx
- 2010-2023历年初中数学单元提优测试卷公式法(带解析).docx
- 2010-2023历年初中毕业升学考试(山东德州卷)化学(带解析).docx
- 2010-2023历年初中毕业升学考试(四川省泸州卷)化学(带解析).docx
文档评论(0)