- 1、本文档共29页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- Acrel用户变电站综合自动化系统.doc
- Acrel电力监控系统在青岛橡胶谷的应用方小燕.doc
- AEG UPS电池的储存安装和维护.doc
- APB税控器网报流程操作流程.doc
- App 暖通专业风管水管材料一览表.doc
- a文化宜化 宜化文化赵小红.docx
- A族创新营销案例:激活万中产消费客户.doc
- A第一单元 综合提升训练 学生稿.doc
- bad防爆灯和防爆马路灯价格.docx
- baidu 自动售货机毕业设计.doc
- 电话号码大班教案 .pdf
- 疫情防控消毒消杀方案(必威体育精装版7篇) .pdf
- 知识竞赛题目 .pdf
- 版初中八年级语文下册第三单元12 诗经二首课时练习03 .pdf
- 的家园》核心素养目标教学设计、教材分析与教学反思-2023-2024.pdf
- 真题技术规范有效版本清单(2023年3月) .pdf
- 精彩三年九年级语文答案2022 .pdf
- 分布式控制系统(DCS)系列:Yokogawa CENTUM VP_(4).CENTUMVP软件组件.docx
- 分布式控制系统(DCS)系列:Siemens PCS 7_(1).SiemensPCS7简介.docx
- 可编程逻辑控制器(PLC)系列:Allen-Bradley ControlLogix_(13).ControlLogix与第三方设备的集成.docx
文档评论(0)