- 1、本文档共38页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MW超高压一次再热汽轮机技术协议仅汽机
DFPS/WELSPUN CAPTIVE POWER GEN LTD,ANJAR ,GUJARAT,INDIA
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 36
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by serie
您可能关注的文档
- AEG UPS电池的储存安装和维护.doc
- APB税控器网报流程操作流程.doc
- App 暖通专业风管水管材料一览表.doc
- a文化宜化 宜化文化赵小红.docx
- A族创新营销案例:激活万中产消费客户.doc
- A第一单元 综合提升训练 学生稿.doc
- bad防爆灯和防爆马路灯价格.docx
- baidu 自动售货机毕业设计.doc
- BB电子商务信用评价模式研究.doc
- BK活性炭,河南郑州活性炭厂.doc
- 10《那一年,面包飘香》教案.docx
- 13 花钟 教学设计-2023-2024学年三年级下册语文统编版.docx
- 2024-2025学年中职学校心理健康教育与霸凌预防的设计.docx
- 2024-2025学年中职生反思与行动的反霸凌教学设计.docx
- 2023-2024学年人教版小学数学一年级上册5.docx
- 4.1.1 线段、射线、直线 教学设计 2024-2025学年北师大版七年级数学上册.docx
- 川教版(2024)三年级上册 2.2在线导航选路线 教案.docx
- Unit 8 Dolls (教学设计)-2024-2025学年译林版(三起)英语四年级上册.docx
- 高一上学期体育与健康人教版 “贪吃蛇”耐久跑 教案.docx
- 第1课时 亿以内数的认识(教学设计)-2024-2025学年四年级上册数学人教版.docx
文档评论(0)