- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- CAD常用快捷键一览表.doc
- CAD全部快捷命令.doc
- b中印原料药产业竞争力比较研究.doc
- CAD快捷键命令表可使用打印A纸查看.doc
- CA车床的数控改造.doc
- CB新商业模式.doc
- CH决策与计划.doc
- CAD快捷键图标.doc
- cat布线方案模板.doc
- CPA税法重点讲座讲义.doc
- DB4403T 521-2024安宁疗护社会工作服务指南.docx
- DB4403T 530-2024餐饮服务单位厨房建设指南.docx
- DB4404T 66—2024停车场运营管理规范.docx
- DB4407T 113—2024行政规范性文件评估规范.docx
- DB4418T 026—2024《连南大叶茶生产技术规程》.docx
- 植物性农产品中多种类农药及其代谢物残留量的测定-气相色谱法.pdf
- DB4403T 527-2024水培叶菜生产技术规程.docx
- DB4408T 40-2024林地切藤开沟施肥一体化作业技术规程.docx
- DB4403T 482-2024建筑电气防火检测技术规范.docx
- 高性能建筑门窗系统应用技术规程.pdf
文档评论(0)