- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PhotoshopCS设计圣诞节祝福壁纸效果教程
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- CAD快捷键命令表可使用打印A纸查看.doc
- CA车床的数控改造.doc
- CB新商业模式.doc
- CH决策与计划.doc
- CAD快捷键图标.doc
- cat布线方案模板.doc
- CPA税法重点讲座讲义.doc
- CA机床纵向进给单元的数控化改造.doc
- C涟源人民东路店主店庆促销活动方案改.doc
- CALTS第七届中国服装行业供应链与物流技术研讨会.doc
- 2024-2025学年小学心理健康五年级京教版(心理健康教育)教学设计合集.docx
- 2024-2025学年小学科学二年级上册粤教粤科版(2017秋)教学设计合集.docx
- 科学实验与环境保护教育结合教学研究课题报告.docx
- 2024-2025学年高中信息技术(信息科技)选修2 网络基础粤教版(2019)教学设计合集.docx
- 2024-2025学年高中地理湘教版必修3湘教版教学设计合集.docx
- 2024-2025学年初中数学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年初中历史与社会(人文地理)九年级下册人教版(新课程标准)教学设计合集.docx
- 数学应用题的趣味化教学研究教学研究课题报告.docx
- 2024-2025学年初中信息技术(信息科技)初中二年级(上册)教科版(云南)教学设计合集.docx
- 2024-2025学年高中地理选择性必修3 资源、环境与国家安全中图版(2019)教学设计合集.docx
文档评论(0)