- 1、本文档共41页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
QM多媒体教室网络中控方案V
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- E带式输送机传动装置.doc
- FICO概念及主要流程一个高手FICO笔记.doc
- E燃气轮机中英文对照表.doc
- FMEA基础知识FMEA的实施方法步骤和程序.doc
- G 四路无线监控套餐影音传输器 远距离视频监控 成套监控系统.doc
- GPP常用英文缩写全称大全.doc
- Google以外的个有哪些信誉好的足球投注网站引擎创新.doc
- GBT 锅炉用水和冷却水分析方法 全硅的测定 低含量硅氢氟酸转换法.doc
- Gmapql毕业设计说明书注塑模具闹钟后盖毕业设计毕业论文开.doc
- ggg压力容器设计必须掌握的知识问答.doc
- DB31T+1499-2024城市轨道交通网络安全通用技术规范.docx
- 《北京的春节》教学课件.ppt
- 统编版语文四年级上册第四单元教案.docx
- 【2020】八年级语文下册第二单元6阿西莫夫短文两篇教案新人教版完整版.pdf
- 上海市奉贤区重点中学2024年中考二模语文试题含解析 .pdf
- 七年级下册政治期末试卷(人教版)答案 .pdf
- 【中考卷】安徽省2022届中考地理全真模拟测试卷(四)(含答案与解析).pdf
- 中医医院临床路径考核管理办法试行(必威体育精装版) .pdf
- 个人2024年工作总结和2024年工作计划模板6篇 .pdf
- 【精品资料+知识汇总】西师版小学数学1-6年级上册知识汇总 .pdf
文档评论(0)