- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- xx网网络中心技术实施方案V.doc
- XXX高速公路监控系统和收费系统技术建议书.doc
- WLAN网络优化实施夏佳晨.doc
- YSA线路主变嵌入式说明书.doc
- ZJB矿用绞车综合保护装置和数字式综合保护装置价格.docx
- yuan用于带式运输机上的单级圆柱齿轮减速器说明书 副本.doc
- [安徽]层框架剪力墙结构商住楼结构图含建筑图计算书PKPM模型.doc
- []《都江堰》教案.doc
- [网上申报基数采集操作流程].doc
- WZCK汇总使用说明书修订版.doc
- 完整版汽车维修技师试卷及答案题库大全含答案(B卷).docx
- 完整版汽车维修技能大赛理论知识考试题库及答案内部题库带答案(新).docx
- 完整版汽车维修技能大赛理论知识考试题库及答案完整版附答案(预热题).docx
- 完整版汽车维修技师试卷及答案真题及答案【各地真题】.docx
- 完整版汽车维修工(考评员、高级考评员) 练习题题库大全附答案(培优A卷).docx
- 完整版汽车维修技师试卷及答案题库免费答案.docx
- 完整版汽车维修技师试卷及答案内部题库及参考答案(基础题).docx
- 完整版汽车维修技师试卷及答案王牌题库精品(各地真题).docx
- 完整版汽车维修技师试卷及答案内部题库及参考答案(基础题).docx
- 完整版汽车维修工(考评员、高级考评员) 练习题题库含答案【能力提升】.docx
文档评论(0)