- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
万吨重整改造预加氢进料聚结器技术协议模板
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- ZJB矿用绞车综合保护装置和数字式综合保护装置价格.docx
- yuan用于带式运输机上的单级圆柱齿轮减速器说明书 副本.doc
- [安徽]层框架剪力墙结构商住楼结构图含建筑图计算书PKPM模型.doc
- []《都江堰》教案.doc
- [网上申报基数采集操作流程].doc
- WZCK汇总使用说明书修订版.doc
- ZZGA高频开关整流器使用说明书.doc
- ····行业关键词.doc
- `券商综治收尾 券业本月新老划断.doc
- “保增长保民生保稳定”系列评论.doc
- 2024年陕西能源职业技术学院高职单招职业技能测验历年参考题库(频考版)含答案解析.docx
- 2025至2031年中国华迪动态信息发布交流管理系统行业投资前景及策略咨询研究报告.docx
- [温州]2024年浙江温州泰顺县事业单位招聘(含面向复员退伍士兵招考岗位)笔试历年典型考点(频考版试.docx
- [深圳]广东深圳市宝安区“湾区先锋”专项公开选聘事业单位工作人员笔试历年典型考点(频考版试卷)附带答.docx
- 2025至2030年中国稳压阀数据监测研究报告.docx
- 2025至2030年中国切割机械设备数据监测研究报告.docx
- 2025至2030年中国妈咪式睡袋数据监测研究报告.docx
- 2025年软陶烛杯项目可行性研究报告.docx
- 2025年中国电压/电流报警设置器市场调查研究报告.docx
- 2025年中国两性霉素B市场调查研究报告.docx
文档评论(0)