- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
上半我国物流行业运行呈现六大特点
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- “璀璨百,先声夺人”校十佳 歌手分赛区大赛策划书.doc
- “机图指南” 打印稿.doc
- “观山湖号”秋季房地产交易会策划方案内部使用,禁止外传.doc
- “行政法与行政诉讼法一”复习资料.doc
- “星巴克”案例分析.docx
- “龙湖物业细节式服务品牌建设及盈利模式创新”暨社区OO实战讲座中房商学院.doc
- “掌上安居”智能平台浙江广厦学院施永琴.doc
- 《ERP原理与应用》专科期末复习指.doc
- 。产万吨高清无铅汽油项目.doc
- 《ERP原理与应用》专科期末复习指导.doc
- 2024年PLA项目资金申请报告代可行性研究报告.docx
- 2024年年3D打印耗材项目资金需求报告代可行性研究报告.docx
- 2024年香水项目资金需求报告代可行性研究报告.docx
- 2024年数字必威体育官网网址电话机项目资金需求报告代可行性研究报告.docx
- 2024年辽宁省辽中区财政所事业单位招考高频难、易错点200题模拟试题通关秘籍题库(综合卷).docx
- 东南福建汽车工业有限公司整理总部社会招聘补招7人模拟试题(共100题)附带答案题库及答案(夺冠).docx
- 内部使用江西省东湖区住房和城乡建设局招聘历年高频难、易错点练习200题王牌题库及下载答案.docx
- 2024年鲁西化工集团股份有限公司招聘应届高校毕业生88人高频难、易错点100题模拟试题附带答案题库.docx
- 2024年教育基地展示系统项目项目投资申请报告代可行性研究报告.docx
- 2024年电子按摩器项目资金申请报告代可行性研究报告.docx
文档评论(0)