- 1、本文档共25页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
下半《兰台世界》目录
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 《公文写作》下得分:!.doc
- 《先民的智慧与创造》教案.doc
- 《公文写作》作业答案.doc
- 《公文写作》上胡鸿杰.doc
- 《医学细胞生物学》设计型实验.doc
- 《公文写作比武》学习材料.doc
- 《写字楼概述》第一分册.doc
- 《合作与共赢》答案.doc
- 《合同法》第条.doc
- 《国际民用航空公约》.doc
- 2022.06.06言语必做100题(三)郭熙(讲义%2B笔记).docx
- 2023年国考新大纲考前冲刺集训营行测-7天7晚-言语判断数资.docx
- 国考-模拟试卷4-市地级:农耕文化(1).pdf
- 【执法】2023年国考模拟试卷申论-法治城市模拟试卷.docx
- 2023年国考新大纲考前冲刺集训营行测-7天7晚-言语判断数资.pdf
- 国考-模拟试卷8-行政执法:筑牢法律底线(1).pdf
- 国考-模拟试卷6-副省级:新时代新征程-.docx
- 国考-模拟试卷9-副省级:更在于行-参考答案.docx
- 【执法】2023年国考模拟试卷申论-法治城市-模拟试卷.docx
- 国考-模拟试卷4-市地级:农耕文化-参考答案.docx
文档评论(0)