- 1、本文档共33页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东莞楼市白皮书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 32
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 《泰康财富人生终身金保险分红型》条款.doc
- 《电子商务专业人才培养方案》版.doc
- 《电脑美术设计与装潢专业》[].doc
- 《新产品开发与创新设计》.doc
- 《水利水电勘测设计现行技术标准目录》第四版.doc
- 《社会保险法》带给劳动者六大利好.doc
- 《病理学B》第次作业2.docx
- 《秸秆能源化利用补助财建[]号.doc
- 《病理学B》第次作业1.docx
- 《电子商务案例分析》教学大纲评估.doc
- 安全生产管理规定宣贯(4篇).pdf
- 【2023年】辽宁省沈阳市-警察招考行政能力测验测试卷(含答案).pdf
- 2023-2024学年广东省梅州市五华县八年级(下)期中物理试卷+答案解析.pdf
- 2021年安徽工业大学软件工程专业《计算机组成原理》科目期末试卷A(有答案).pdf
- 高本衔接协同育人模式下教学管理研究与实践.pdf
- 用水计量管理制度_用水计量管理制度办法_1.pdf
- ANSYS经典应用局部刚性区域的方法施加约束或者集中载荷(包含APDL命令流).pdf
- 《三国演义》读书笔记(集锦15篇).pdf
- DB37T4313-2021小于0.1-MPa低压锅炉-安全技术要求.pdf
- 人教版初中数学八年级下册《勾股定理》教案.pdf
文档评论(0)